My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to identify the particular product and to form an opinion as to its conformity to the <br />specifications. The data shall comply with Paragraph 1.07 of this Section. <br />C. Facilities and labor for handling and inspection of all materials and equipment <br />shall be furnished by the Contractor. If the Engineer requires, either prior to <br />beginning or during progress of the work, the Contractor shall submit samples of <br />materials for such special tests as may be necessary to demonstrate that they <br />conform to the specifications. Such samples shall be furnished, stored, packed, <br />and shipped as directed at the Contractor's expense. <br />D. The Contractor shall submit data and samples sufficiently early to permit <br />consideration and approval before materials are necessary for incorporation in <br />the work. Any delay of approval resulting from the Contractor's failure to submit <br />samples or data promptly shall not be used as a basis of claim against the Owner <br />or the Engineer. <br />E. In order to demonstrate the proficiency of workmen or to facilitate the choice <br />among several textures, types, finishes, and surfaces, the Contractor shall <br />provide such samples of workmanship or finish as may be required. <br />F. The materials and equipment used on the work shall correspond to the approved <br />samples or other data. <br />1.04 MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION <br />A. When Contract Documents require that installation of work shall comply with <br />manufacturer's printed instruction, obtain and distribute copies of such <br />instructions to parties involved in the installation, including copies to the Engineer. <br />1. Maintain one set of complete instructions at the job site during installation <br />and until completion. <br />B. Handle, install, connect, clean, condition and adjust products in strict accord with <br />such instructions and in conformity with specified requirements. <br />1. Should job conditions or specified requirements conflict with <br />manufacturer's instructions, consult with Engineer for further instructions. <br />2. Do not proceed with work without clear instructions. <br />C. Perform work in accord with manufacturer's instructions. Do not omit any <br />preparatory step or installation procedure unless specifically modified or <br />exempted by Contract Documents. <br />1.05 TRANSPORTATION AND HANDLING <br />A. Arrange deliveries of Products in accord with construction schedules, coordinate <br />to avoid conflict with work and conditions at the site. <br />1. Deliver Products in undamaged condition, in manufacturer's original <br />containers or packaging, with identifying labels intact and legible. <br />06/07 01600 -2 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.