My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w. <br />Ell!" <br />E-11, <br />�L{ <br />V? <br />K <br />V <br />h <br />F��' <br />D. Should the Engineer determine that the Work is not substantially complete, he will <br />advise the Contractor of construction that must be completed or corrected before <br />the certificate will be issued. <br />1. The Engineer will repeat inspection when requested and assured that the <br />Work has been substantially completed. <br />2. Results of the completed inspection will form the basis of requirements for <br />final acceptance. <br />1.04 FINAL COMPLETION <br />A. When Contractor considers the Work to be complete, he shall submit written <br />certification to the Engineer that the Work is completed and ready for final <br />inspection. Include the following: <br />1. Submit the final payment request with releases and supporting <br />documentation not previously submitted and accepted. Include <br />certificates of insurance for products and completed operations where <br />required. <br />2. Submit an updated final statement, accounting for final additional changes <br />to the Contract Sum. <br />3. Submit a certified copy of the Engineer's final inspection list of items to be <br />completed or corrected, stating that each item has been completed or <br />otherwise resolved for acceptance, the list has been endorsed and dated <br />by the Engineer. <br />4. Submit final meter readings for utilities, a measured record of stored fuel, <br />and similar data as of the date of Substantial Completion, or when the <br />Owner took possession of and responsibility for corresponding elements <br />of the Work. <br />5. Submit consent of surety to final payment. <br />6. Submit evidence of final, continuing insurance coverage complying with <br />insurance requirements. <br />B. The Engineer will inspect the Work upon receipt of notice that the Work, including <br />inspection list items from earlier inspections, has been completed, except items <br />whose completion has been delayed because of circumstances acceptable to the <br />Engineer. <br />1. Upon completion of inspection, the Engineer will prepare a certificate of <br />final acceptance, or advise the Contractor of Work that is incomplete, or of <br />obligations that have not been fulfilled but are required, for final <br />acceptance. <br />2. If necessary, reinspection process will be repeated. <br />1.05 RECORD DOCUMENT SUBMITTALS <br />A. Maintain at the site one complete set of record documents; protect from <br />deterioration and loss in a secure, fire - resistive location. <br />1. Provide access to record documents for the Engineer's reference during <br />normal working hours. <br />2. Label each document "PROJECT RECORD" in 2 inch high printed letters. <br />3. Do not use for construction purposes. <br />B. Record Drawings: Maintain a clean, undamaged set of blue or black line <br />white - prints of Contract Drawings and Shop Drawings. Mark the set to show the <br />06/07 01701 -2 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.