Laserfiche WebLink
F. Miscellaneous Record Submittals: Refer to other Specification Sections for <br />requirements of miscellaneous record - keeping and submittals in connection with <br />actual performance of the Work. <br />G. At Contract close -out, deliver one copy of Record Documents to Engineer for <br />Owner. Accompany submittal with transmittal letter in duplicate containing the <br />following information: <br />1. Date. <br />2. Project title and number. <br />3. Contractor's name and address. <br />4. Title and number of each Record Document. <br />5. Signature of Contractor or his authorized representative. <br />PART 2 - PRODUCTS (Not Applicable) <br />PART 3 - EXECUTION <br />3.01 FINAL CLEANING <br />A. Remove temporary protection and facilities installed for protection of the Work <br />during construction. <br />B. Comply with regulations of authorities having jurisdiction and safety standards for <br />cleaning. Do not burn waste materials. Do not bury debris or excess materials <br />on the Owner's property. Do not discharge volatile, harmful or dangerous <br />materials into drainage systems. Remove waste materials from the site and <br />dispose of in a lawful manner. <br />C. Where extra materials of value remaining after completion of associated Work <br />have become the Owner's property, arrange for disposition of these materials as <br />directed. <br />END OF SECTION <br />06/07 01701 -4 03 -4197 <br />