My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOCUMENT 01720 <br />PROJECT RECORD DOCUMENTS <br />N <br />1 06/07 01720 -1 03 -4197 <br />PART 1 - <br />GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. <br />Maintain at the site for the Owner one record copy of: <br />1. Drawings <br />2. Specifications <br />3. Addenda <br />4. Change Orders Modifications to the Contract <br />and other <br />5. Engineer's Field Orders or Written Instructions <br />6. Approved Shop Drawings, Working Drawings, and Samples <br />7. Field Test Reports <br />8. Construction Photographs <br />1.02 RELATED REQUIREMENTS <br />A. <br />Section 01340: Shop Drawings, Working Drawings, and Samples <br />B. <br />Section 01050: Field Engineering <br />C. <br />Section 01701: Project Closeout <br />1.03 MAINTENANCE OF DOCUMENTS AND SAMPLES <br />A. <br />Store documents and samples in Contractor's field office apart from documents <br />used for construction. <br />B. <br />File documents and samples in accordance with CSI format number system. <br />C. <br />Maintain documents in a clean, dry, legible condition and in good order. Do not <br />use record documents for construction purposes. <br />D. <br />Make documents and samples available at all times for inspection by the <br />Engineer. <br />E. <br />As a prerequisite for monthly progress payments, the Contractor is to exhibit the <br />currently updated "record documents" for review by the Engineer and the Owner. <br />N <br />1 06/07 01720 -1 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.