Laserfiche WebLink
a <br />t <br />a <br />a <br />s <br />e <br />t <br />t <br />t <br />111H <br />C. Identify area of responsibility of each <br />d. Local source of supply for parts and replacement. <br />4. Identify each product name and other identifying symbols as set forth in <br />Contract Documents. <br />B. Product Data: <br />1. Include only those sheets which are pertinent to the specific product. <br />2. Annotate each sheet to: <br />a. Clearly identify specific product or part installed. <br />b. Clearly identify data applicable to installation. <br />C. Delete references to inapplicable information. <br />C. Drawings: <br />1. Supplement product date with drawings as necessary to clearly illustrate: <br />a. Relations of component parts of equipment and systems. <br />b. Control and flow diagrams. <br />2. Coordinate drawings with information in Project Record Documents to <br />assure correct illustration of completed installation. <br />3. Do not use Project Record Documents as maintenance drawing. <br />D. Written text, as required to supplement product date for the particular <br />installation: <br />1. Organize in consistent format under separate headings for different <br />procedures. <br />2. Provide logical sequence of instructions of each procedure. <br />E. Copy of each warranty, bond and service contract issued: <br />1. Provide information sheet for Owner's personnel, give: <br />a. Proper procedures in event of failure. <br />b. Instances which might affect validity of warranties or bonds. <br />1.06 MANUAL FOR MATERIALS AND FINISHES <br />A. Submit five copies of complete manual in final form. <br />B. Content; for architectural products, applied materials and finishes: <br />1. Manufacturer's data, giving full information on products. <br />06/07 01730 -3 03 -4197 <br />