My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ri <br />r <br />C. Subbase Material: Naturally or artificially graded mixture of natural or crushed <br />gravel, crushed stone, crushed slag, natural or crushed sand. <br />D. Drainage Fill: Washed, evenly graded mixture of crushed stone, or crushed or <br />uncrushed gravel, with 100 percent passing a 1 -1/2 in. sieve and not more than 5 <br />percent passing a No. 4 sieve. <br />E. Backfill and Fill Materials: Satisfactory soil materials free of clay, rock or gravel <br />larger than 2 in. in any dimension, debris, waste, frozen materials, vegetable and <br />other deleterious matter. <br />PART 3 - EXECUTION <br />3.01 EXCAVATION <br />06/07 <br />A. Excavation is Unclassified, and includes excavation to subgrade elevations <br />indicated, regardless of character of materials and obstructions encountered. <br />B. Unauthorized Excavation: Removal of materials beyond indicated subgrade <br />elevations or dimensions without specific direction. Unauthorized excavation, as <br />well as remedial work directed by Engineer, shall be at Contractor's expense. <br />C. Additional Excavation: <br />1. When unsuitable bearing materials are encountered at required subgrade <br />elevations, carry excavations deeper and replace excavated material as <br />directed by Engineer. <br />2. Removal of unsuitable material and its replacement as directed will be <br />paid on basis of contract conditions relative to changes in work. <br />D. Stability of Excavations: <br />1. Slope sides of excavations to comply with local codes and ordinances <br />having jurisdiction. <br />2. Shore and brace where sloping is not possible because of space <br />restrictions or stability of material excavated. <br />3. Maintain sides and slopes of excavations in safe condition until <br />completion of backfilling. <br />E. Shoring and Bracing: <br />1. Establish requirements for trench shoring and bracing to comply with local <br />codes and authorities having jurisdiction. <br />2. Maintain shoring and bracing in excavations regardless of time period <br />excavations will be open. Carry down shoring and bracing as excavation <br />progresses. <br />F. Dewatering: <br />1. Prevent surface water and subsurface or ground water from flowing into <br />excavations. <br />2. Do not allow water to accumulate in excavations. <br />02200 -2 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.