Laserfiche WebLink
L <br />Part 1 — General <br />1.01 Scope of Work <br />SECTION 02210 <br />FINE GRADING <br />06/07 02210 -1 03 -4197 <br />A. <br />Provide all labor, materials, necessary equipment or services to complete the <br />Fine Grading work, as indicated on the drawings, as specified herein or both. <br />1.02 Related Work <br />A. <br />Section 02481 — Shrub and Tree Relocation <br />B. <br />Section 02484 — Soil Preparation and Soil Mixes <br />C. <br />D. <br />Section 02487 — Sodding <br />Section 02490 — Trees, Plants, and Groundcovers <br />1.03 Site Inspection <br />A. <br />The Contractor shall visit the site and acquaint himself with all existing <br />conditions. The Contractor shall be responsible for his own subsurface <br />investigations, as necessary, to satisfy requirements of this section. All <br />subsurface investigations shall be performed only under time schedules and <br />arrangements approved in advance by the Landscape Architect or Owner's <br />Representative. <br />1.04 Existing Contours <br />A. <br />The existing grades shown on the drawings are approximate only (within +2 <br />inches) and the contractor is responsible for grading to meet existing grades as <br />required. <br />B. <br />The contours and grades established under contract will be the finished grades <br />shown. The Contractor under this Contract shall perform the work for <br />construction using the finished grades previously established and making <br />whatever corrections and /or repairs to grades to make them consistent with the <br />requirements of the drawings and specifications. <br />C. <br />Established finished grades shall be approved by the landscape Architect for all <br />project areas prior to initiating landscape planting. <br />1.05 Utilities <br />A. <br />Locate all existing, active utility lines traversing the site and determine the <br />requirements for their protection. Preserve in operating condition all active <br />utilities adjacent to or traversing the site that are designated to remain. <br />B. <br />Observe rules and regulations governing respective utilities in working under <br />requirements of this section. Adequately protect utilities from damage, remove or <br />relocate as indicated, specified or required. Remove, plug or cap inactive or <br />abandoned utilities encountered in excavation. Record location of active utilities. <br />06/07 02210 -1 03 -4197 <br />