My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02513 <br />ASPHALTIC CONCRETE PAVING <br />PART 1 - GENERAL <br />1.01 SCOPE OF WORK <br />A. Furnish all labor, materials, equipment and incidentals required and place <br />asphaltic concrete pavement in accordance with the grades and typical sections <br />shown on the Drawings and as specified herein. <br />1.02 RELATED WORK <br />A. Section 02200 - Earthwork. <br />1.03 SUBMITTALS <br />A. Submit shop drawings as specified in Section 01340. <br />PART 2 - PRODUCTS <br />2.01 MATERIALS <br />A. All Materials shall conform to the requirements of the Florida Department of <br />Transportation Specifications. <br />PART 3 - EXECUTION <br />3.01 INSTALLATION <br />A. The subgrade preparation shall comply with the requirements of the Florida <br />Department of Transportation Specifications. All soft and yielding material and <br />other portions of the subgrade which will not compact readily shall be removed <br />and replaced with suitable material and the whole subgrade brought to line and <br />grade and to a foundation of uniform compaction and supporting power. <br />B. The top 12 inches of the subgrade, in both cut and fill sections, shall be <br />compacted to a density of not less than 100 percent of the maximum density as <br />determined by the AASHTO Method T -180. If shown on the Drawings, compact <br />subgrade to a Florida Bearing Value of 75 psi. Unless the subgrade material at <br />the time of compacting contains sufficient moisture to permit proper compaction it <br />shall be moistened as necessary and then compacted. Subgrade material <br />containing excess moisture shall be permitted to dry to the proper consistency <br />before being compacted. The subgrade shall be shaped prior to making the <br />density tests. The required density shall be maintained until the base or <br />pavement has been laid or until the aggregate materials for the base or <br />pavement course have been spread in place. <br />C. The minimum compacted thickness of the limerock base shall be 12 inches <br />applied in three layers of equal depth unless otherwise shown on the Drawings. <br />01107 02513 -1 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.