My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B <br />1 <br />i <br />D <br />e <br />v <br />a <br />s <br />i <br />s <br />v <br />0 <br />H11 <br />SECTION 02611 <br />REINFORCED CONCRETE PIPE <br />PART 1 - GENERAL <br />1.01 SCOPE OF WORK <br />A. Furnish all labor, materials, equipment and incidentals required and install in the <br />locations as shown on the drawings, the reinforced concrete pipe (R.C.P.) and <br />appurtenances as described herein. <br />1.02 RELATED WORK <br />A. Section 02221: Trenching, Bedding and Backfill for Pipe <br />1.03 DESCRIPTION OF SYSTEM <br />A. Piping shall be installed at the location shown on drawings. <br />1.04 QUALIFICATIONS <br />A. All R.C.P. and appurtenances shall be furnished by a single manufacturer who is <br />fully experienced, reputable, and qualified in the manufacture of the items to be <br />furnished. The equipment shall be designed, constructed, and installed in <br />accordance with the best practices and methods and shall comply with these <br />Specifications. <br />1.05 SUBMITTALS <br />A. Shop drawings shall be submitted to the Engineer for approval and shall include <br />dimensioning and technical specification for all piping to be furnished. <br />1.06 TOOLS <br />A. Special tools, solvents, lubricants, and caulking compounds required for normal <br />installation shall be furnished with the pipe. <br />PART 2- PRODUCTS <br />2.01 MATERIALS <br />A. R.C.P. shall be in accordance with ASTM C -76 -88 Class II wall B and as <br />manufactured by United States Concrete Pipe Co. or approved equal. <br />B. All pipe shall be bundled or packaged in such a manner as to provide adequate <br />protection for the ends, threaded, or flanged, during transportation from the <br />manufacturer. <br />06/07 02611 -1 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.