My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />n <br />L <br />0 <br />C <br />L <br />III <br />L <br />v <br />e <br />SECTION 02931 <br />SODDING <br />PART 1 - GENERAL <br />1.01 WORK INCLUDED <br />A. Furnish all labor, materials, equipment and incidentals required to prepare lawn <br />bed and install sodding as shown on contract drawings and as specified herein. <br />B. Area to receive sodded grass lawns within the landscape limits shown on the <br />drawings except as noted herein shall be as designated on the Drawings. <br />1.02 SUBMITTALS <br />A. Provide technical data as specified in Section 01340 for shop drawings on all <br />materials or installation procedures required under this Section. <br />B. Submit representative topsoil samples for analysis by a private laboratory to <br />determine nutrient deficiencies and outline a proper fertilization program. <br />C. Submit as provided in Section 01720 certifications required for all sodding <br />supplied. <br />PART 2 - PRODUCTS <br />2.01 SOD <br />A. Sod shall be St. Augustine Floritam of firm texture having a compacted growth <br />and good root development as approved. <br />B. Sod shall be certified to meet Florida State Plant Board specifications, absolutely <br />true to varietal type, and free from weeds or other objectionable vegetation, <br />fungus, insects and disease of any kind. <br />C. Before being cut and lifted, the sod shall have been mowed 3 times with the final <br />mowing not more than a week before cutting into uniform dimensions. <br />2.02 SOIL CONDITIONERS <br />06/07 <br />A. Fertilizer: <br />1. Fertilizer shall be a complete fertilizer, the elements of which are derived <br />from organic sources. Fertilizer shall be a standard product complying <br />with State and Federal fertilizer laws. <br />2. Percentages of nitrogen, phosphorus and potash shall be based on <br />laboratory tests on soils outlined in Paragraph 1.02B and approved by the <br />Engineer. For purpose of bidding, assume 6% nitrogen, 6% phosphorus <br />and 6% potash by weight. At least 50% of the total nitrogen shall contain <br />no less than 3% water - insoluble nitrogen. <br />02931 -1 <br />03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.