Laserfiche WebLink
L <br />fl <br />L� <br />L <br />,t <br />E <br />J <br />7 <br />r <br />C <br />7 <br />C <br />C <br />n <br />C <br />n <br />r <br />SECTION 00900 <br />Addendum No. 1 <br />to <br />Contract documen <br />CITY OF SUNNY ISLES BEACH <br />ND <br />172 STREET ROADWAY IMPROVEMENTS <br />CGA PROJECT NO. 03 -4197 <br />CITY BID NO. 07 -05 -01 <br />To All Bidders: <br />Bidders for the above - referenced project shall take note of the following changes, <br />additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br />IN THE CONTRACT DOCUMENTS: <br />1. Attached Pre -bid minutes to be added to contract documents. <br />2. Section 00300, Pages 00300 -2, 00300 -3 and 00300 -4 to be replaced in its entirety. <br />3. In response to bidders RFI "S: <br />RFI from Development FL: <br />1) In the Drawings (Demolition Plans) C100 and C101 shown about the Power <br />Poles to be relocated by Others, but in the Bid Schedule has the Item No. 12 <br />Relocate power /light poles? What is Correct? <br />Response: Pole removal will be undertaken by FPL. <br />2) Is there an Engineer Cost? <br />Response: Approximately I million <br />— RFI from Tenex: <br />3) On sheet C200 of the bid set of Plans it indicates "Contractor to clean existing <br />well and structures, contractor to core exist. Structure and connect Prop. 24" <br />RCP." We do not have a bid item, please indicate HOW SHALL WE PROCEED? <br />Response: See attached revised Bid Schedule, additional items added. <br />All other documents, specifications, drawings, terms and conditions remain the same. <br />Bidders must acknowledge receipt of Addendum on Page 00300 -6. <br />END OF SECTION <br />1 Final Version 6/07 00900 -1 <br />03 -4197 <br />