My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1183
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2012 11:24:00 AM
Creation date
3/7/2008 3:44:16 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1183
Date (mm/dd/yyyy)
12/13/2007
Description
Fishing Pier Letter of Agrmt with Dr. Cornfeld
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />INSPECTION REPORT <br /> <br />Structure No.: <br /> <br />N/A <br /> <br />Date: 11-0ct-07 <br /> <br />M~RP,BDMf>_~ ROUTINE REPORT <br />ENGINEE:rllNt~ .. /Z SUBMITTED BY: Marlin Diving Inspections, Inc. <br /> _AA.l \~ <br /> CONTENTS OF REPORT <br />A. Location Map F. Photo Section <br />* B. Plan and Elevation Photos * G. Fracture Critical Data <br />* C. Load Rating Analysis Summary H. Recommended Repairs <br />* D. Inspection Field Preparation * I. Scour Evaluation <br />E. Element Notes * J. Mechanical and Electrical <br /> * This section is not included in this report <br /> PREPARED FOR: CITY OF SUNNY ISLES BEACH <br /> BY: MARLIN DIVING INSPECTIONS, INC. <br /> REPORT IDENTIFICATION <br />Structure No.: N/A UW Inspection Date: 10/11/2007 <br />Structure Name: SUNNY ISLE FISHING PIER <br />Road Name/Number: N/A <br />Feature Intersected: N/A <br />Location: Eastern End of Sunny Isles Boulevard. <br />Type of Inspection: DRoutine UW Dlnterim D [] Special <br /> INSPECTION CONDITIONS <br />Maximum Depth: 12 ft. Equipment Used: Dive Gear, Dive Flaq, <br />Water Type: Salt Insoection tools, UIW Liqhts, Diqital <br />Currents: Strong Camera, Probin~ device. <br />Visibility: Less than 1 ft. Elements Inspected: Timber oiles, PVC cover concrete columns, <br />Bottom: Sandy Steel qirders, steel floor beams, timber floo <br />Water Temp.: 820 strinaers, <br />Weather: Sunny <br />Special Crew Hours: 6 hrs x 3 inspectors Hazards: Rio current, sharks, wave action. <br />Critical Deficiency Notes: None <br /> Personnel 1 Title 1 Number Initials <br /> Porras, Omar - Senior Diver Bridge Inspector (CBI # 368) Lead <br /> Abreu, Jose - Assistant Bridge Inspector (Diver) <br /> Alvarez, Jose - Assistant Bridge Inspector (Diver Tender) <br /> Vazquez, Eduardo - Bridge Inspection Supervisor (CBI # 369) <br /> <br />Page 1 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.