My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1198
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2016 11:30:17 AM
Creation date
2/28/2008 2:51:41 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1198
Date (mm/dd/yyyy)
01/17/2008
Description
Marlin - Newport Pier Engineering Services Agrmt ($441,303.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />OF 5U '" <br /> <br />TO: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />RE: <br /> <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />(305) 947-0606 City Hall <br />(305) 949-3 I I 3 Fax <br />(305) 947-2150 Building Department <br />(305) 947-5107 Fax <br /> <br />City Commission <br />Norman S. Edelcup, Mayor <br />Lewis J. Thaler, Vice Mayor <br />Roslyn Brezin, Commissioner <br />Gerry Goodman, Commissioner <br />George "Bud" Scholl, Commissioner <br /> <br />A. John Szerlag, City Manager <br />Hans Ottinot, City Attorney <br />Jane A. Hines, City Clerk <br /> <br />MEMORANDUM <br /> <br />The Honorable City Commiss:n ~ SO". , <br /> <br /> <br />A. John Szerlag, City Managr 2>U <br /> <br /> <br />January 17,2008 <br /> <br />Award of Engineering Services for Demolition and Reconstruction of Sunny <br />Isles Beach/Newport Fishing Pier <br /> <br />Recommendation <br /> <br />I recommend Marlin Engineering, Inc. provide civil engineering services for the design, <br />specification, and permitting documents for the demolition and reconstruction of the Sunny Isles <br />Beach/Newport Fishing Pier. Specific elements of the scope of work are detailed in the attached <br />proposal. Cost of the proposal will be on an hourly rate not to exceed $441,303.00 Funding is <br />provided through a public/private partnership with Dr. Comfeld. Specifically, this is account # <br />20-600-5670. <br /> <br />Removal and replacement of the fishing pier needs to be accomplished in an expedient fashion <br />because the structure east of the shoreline is structurally deficient. As such, this recommendation <br />includes circumventing the quality-based selection procedure and going directly with Marlin <br />Engineering. Other reasons for doing this follow: <br /> <br />1. Marlin Engineering was recently selected as the most qualified firm to construct our <br />marine proj ects which are the' Pedestrian/Emergency Vehicular Bridge, and boardwalk. <br />2. Marlin Engineering has first-hand experience with the pier, as they conducted the <br />inspection thereof. <br />3. Attached is a cost analysis from Public Works & Engineering Director Rick Conner, <br />who is also a licensed professional engineer, indicating that compensation for <br />professional services to Marlin is reasonable. <br /> <br />Thank you. <br /> <br />AJS/pw <br /> <br />AttacIunent( s) <br /> <br />Commission - Newport Fishing Pier Engr Svs By Marlin Memo <br />
The URL can be used to link to this page
Your browser does not support the video tag.