Laserfiche WebLink
<br />CI2 One Self Propelled 24" Deep by 6" I Hours X $ 65.00 <br /> Wide Trencher with an Operator Per Hour = <br />CI3 One Self Propelled 24" Deep by 6" I Days X 520.00 <br /> Wide Trencher with an Operator Per Day = <br />CI4 One Self Propelled 24" Deep by 6" I Week X 520.00 <br /> Wide Trencher with an Operator Per Day = <br />CI5 One Self Propelled 24" Deep by 6" I Month x $ 520.00 <br /> Wide Trencher with an Operator Per Month = <br />CI6 Bucket Truck I Bucket Truck X $ 45.00 <br /> Per Hour = <br />Cl7 Chipper Brush I Chipper Brush X $ 40.00 <br /> Per Hour = <br />CIS Stump Grinder I Stump Grinder X $ 40.00 <br /> Per Hour = <br />CI9 Grapple Loader X $ 50.00 <br /> (30 cubic yard capacity) I Grapple Loader Per Hour = <br />C SUBTOTAL <br /> <br />D. MATERIALS <br /> <br />Dl Topsoil (70/30 Mix) I Cubic Yards X $ 30.00 <br /> Delivered and Installed Per Cubic Yard = <br />D2 Premium Red or Premium Gold Mu I Cubic Yards X $ 32,00 <br /> Delivered and Installed Per Cubic Yard = <br />D3 #70 Trap Sand I Cubic Yards X $ 50.00 <br /> Delivered and Installed Per Cubic Yard = <br />D4 Atlas 3000 (or equal) Mix I Cubic Yards X $ 37.50 <br /> Delivered and Installed Per Cubic Yard = <br /> <br />PAGE 32 OF 92 <br />Big No, 07-10-04 <br />