<br />use of any such term or adjective shall not be effective to
<br />assign to ENGINEER any duty or authority to supervise
<br />or direct the performance of the Work or any duty or
<br />authority to undertake responsibility contrary to the
<br />provisions of paragraph 9.10 or any other provision of the
<br />Contract Documents.
<br />
<br />B. Day
<br />
<br />1. TIle word "dayn shall constitute a calendar day
<br />of 24 hours measured from midnight to the next midnight.
<br />
<br />C. Defective
<br />
<br />1. The word "defective, n when modifying the word
<br />"Work," refers to Work that is unsatisfactory, faulty, or
<br />deficient in that it does not conform to the Contract
<br />Documents or does not meet the requirements of any
<br />inspection, reference standard, test, or approval referred
<br />to in the Contract Documents, or has been damaged prior
<br />to ENGINEER's recommendation of final payment
<br />(unless responsibility for the protection thereof has been
<br />assumed by oWNER at Substantia! Completion in accor-
<br />dance with paragraph 14.04 or 14.05).
<br />
<br />D. Furnish, lrzstall, Perfomz, Provide
<br />
<br />1. The word "furnish," when used in connection
<br />with services, materials, or equipment, shall mean to
<br />supply and deliver said services, materials, or equipment
<br />to the Site (or some other specified location) ready for use
<br />or installation and in usable or operable condition.
<br />
<br />2. The word "install:' when used in connection
<br />wilh services, materials, or equipment, shall mean to put
<br />into use or place in final position said services. materials,
<br />or equipment complete and ready for intended use.
<br />
<br />3. The words "perform" or "provide," when used
<br />in connection with services, materials, or equipment,
<br />shall mean to furnish and install said services, materials,
<br />or equipment complete and ready for illtended use.
<br />
<br />4. When "furnish," "install," "perform," or "pro-
<br />vide" is not used in connection with services, materials,
<br />or equipment in a context clearly requiring an obligation
<br />of CONTRACTOR, "provide" is implied.
<br />
<br />E. Unless stated othelWise in the Contract Documents,
<br />words or phrases which have a well-known technical or
<br />coostroetion industry or mde meaning are used in the
<br />Contract Documents in accordance with such recognized
<br />meaning.
<br />
<br />ARTICLE 2 - PRELIMINARY MA TIERS
<br />
<br />2.01 Delivery of Bonds
<br />
<br />A, When CONTRACTOR delivers the executed
<br />Agreements to OWNER, CONTRACTOR shall also deliver
<br />to OWNER such Bonds as CONTRACTOR may be required
<br />to furnish,
<br />
<br />2.02 Copies of DocumefUs
<br />
<br />A. OWNER shall furnish to CONTRACTOR up te tell
<br />copies of the Contract Documents. Additional copies will be
<br />furnished upon request at the cost of reproduction.
<br />
<br />2.03 Commencement oj Contract Times; Notice to Proceed
<br />
<br />A. The Contract Times will commence to run on the
<br />thirtieth day after the Effective Date of the Agreement or, if
<br />a Notice to Proceed is given, on the day indicated in the
<br />Notice to Proceed. A Notice to Proceed may be given at any
<br />time within 30 days after the Effective Date of the
<br />Agreement. In no event will the Contract Times commence
<br />to run later than the sixtieth day after lhe day of Bid opening
<br />or the thirtieth day after the Effective Date of the Agreement,
<br />whichever date is earlier.
<br />
<br />2,04 Starting the Work
<br />
<br />A. CONTRACTOR shall start to perform the Work on
<br />the date when the Contract Times commence to run. No
<br />Work shall be done at the Site prior to the date on which the
<br />Contract Times commence to run.
<br />
<br />2;{)5 Before Starting Construction
<br />
<br />A. CONIRA.crOR's Review oj Contract Documents:
<br />Before undertaking each part of the Work, CONTRACTOR
<br />. shall carefully study and 'compare the Contract Documents
<br />and check and verify pertinent figures therein and all
<br />applicable field measurements.' COmRACTOR shall
<br />promptly report in writing to ENGINEER any conflict, error,
<br />ambiguity. or discrepancy which CO~1RACTOR may
<br />discover and shall obtain a written interpretation' or
<br />clarification from ENGINEER before proceeding with any
<br />Work affected thereby; however, CONTRACTOR shall nol
<br />be liable to OWNER or ENGINEER for failure to report any
<br />conflict. error, ambiguity, or discrepancy in the Contract
<br />Documents unless CONTRACTOR knew or reasonably
<br />should have known theo:of.
<br />
<br />1"
<br />B. Preliminary Schedules.' Within ten days after the
<br />Effective Date of the Agreement (unle:;s otherwise specified
<br />
<br />00700 - 9