Laserfiche WebLink
<br />3. Payments made by CONTRACTOR to <br />Subcontractors for Work performed by Subcontractors. <br />If required by OWNER, CONTRACTOR shall obtain <br />competitive bids from subcontractors acceptable to <br />OWNER and CONTRACTOR and shall deliver such <br />bids to OWNER, who will then determine, with the <br />advice of ENGINEER, which bids, if any. will be <br />acceptable. If any subcontract provides that the <br />Subcontractor is to be paid on the basis of Cost of the <br />Work plus a fcc. the Subcontractor's COSI of the Work <br />and fee shall be detemlined in the same manner as <br />CONTRACTOR's COSl of the Work and fee as provided <br />in this paragraph 11.01. <br /> <br />4. Costs of special consultants (including but not <br />limiled to engineers, architects, testing laboratories, <br />surveyors. attorneys, and accountants) employed for <br />services specifically related to the Work. <br /> <br />5. Supplemental costs including the following: <br /> <br />a. Tbe proportion of necessary transportation, <br />travel, and subsistence expenses of <br />CONTRACTOR's employees incurred in discharge <br />of duties connected with the Work. <br /> <br />b. Cost, including transportation and mainte- <br />nance, of all materials, supplies, equipment, <br />machinery, appliances, office, and temporar}' facili- <br />ties al the Site, and hand lools nOI owned by the <br />workers. which are consumed in the performance of <br />the Work, and cost, less markel value, of such items <br />used but not consumed which remain the property of <br />CONTRACTOR. <br /> <br />c. Rentals of all construction equipment and <br />machinery. and the parts thereof whether rented <br />from CONTRACTOR or others in accordance with <br />rental agreements approved by OWNER with the <br />advice of ENGINEER, and the costs of <br />transportation, loading, unloading, assembly, <br />dismantling, and removal thereof. All such costs <br />shall be in accordance with the terms of said rental <br />agreements. Tbe rental of any such equipment, ma- <br />chinery. or parts shall cease when the use thereof is <br />no longer necessary for the Work. <br /> <br />d. Sales. consumer. use, and oilier similar <br />laXes related to the Work, and for which CON- <br />TRACTOR is liable. imposed by Laws and Regu- <br />lations. : <br /> <br />e, Deposits lost for causes oilier than negli- <br />gence of CONTRACTOR. any Subcontractor, or <br />anyone directly or indirectly employed by any of <br />them or for whose acts any of them may be liable, <br /> <br />00700 - 31 <br /> <br />and royalty payments and fees for permits and <br />licenses. <br /> <br />f. Losses and damages (and related expenses). <br />caused by damage to the Work. not compensated by <br />insurance or otherwise, sustained by <br />CONTRACTOR in coIUlection with the perfor- <br />mance of the Work (except losses and damages <br />within ilie deductible amounts of property insurance <br />established in accordance wiili paragraph 5.06.D), <br />provided such losses and damages have resulted <br />from causes other than the negligence of <br />CONTRACTOR, any Subcontractor, or anyone <br />directly or indirectly employed by any of them or <br />for whose acts any of them may be liable. Such <br />losses shall. include settlements made with the <br />written consent and approval of OWNER. No such <br />losses. damages. and expenses shall be .included in <br />the Cost of the'Work for the purpose of detennining <br />CONTRACTOR's fee. <br /> <br />g. The cost of utilities, fuel, and sanitary <br />facilities at the Site. <br /> <br />h. Minor expenses such as telegrams, long <br />distance telephone calls, telephone service at the <br />Site, expressage, and similar pett}' cash items in <br />connection with the Work. <br /> <br />i. When the Cost of the Work is used 10 <br />determine the value of a Change Order or of a <br />Claim, the cost of premiums for additional Bonds <br />and insurance required because of the changes in the <br />Work or caused by the event giving rise to the <br />Claim. <br /> <br />j. When all the Work is performed on the <br />basis of ' cost-plus. the costs of premiums for all <br />Bonds and insurance CONTRACTOR is required by <br />the Contract'Documents to purchase and maintain. <br /> <br />B. Costs Excluded: The term Cost Of the Work shall <br />not include any of the following items: <br /> <br />1 . Payroll costs and other compensation of <br />CONTRACTOR's officers, executives, principals (of <br />partnersWps and sole proprietorsWps), general manag- <br />ers. engineers, architects. estimators, attorneys, audi- <br />tors. accountants. purchasing and contracting agents, <br />expediters. timekeepers. clerks. and other personnel <br />employed by CONTRACTOR. whether at the Site or in <br />CONTRACTOR's principal or branch office for general <br />administration of the Work and not specifically included <br />in the agreed upon schedule of. job classifications <br />referred to in paragraph 11.01.A.l or specifically <br />covered by paragraph 11.01 :4....4. all of which are to be <br />