My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1221
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:35 AM
Creation date
3/17/2008 9:44:27 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1221
Date (mm/dd/yyyy)
02/21/2008
Description
Southeastern - Central Island Drainage Proj Agrmt (Bid 07-10-02) ($3,635,852.02)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Article 7, fires, floods, epidemics, abnormal weather <br />conditions, or acts of God. <br /> <br />12.04 Delays lVi/hin CONTRACTOR's Colllro{ <br /> <br />A. The Contract Times (or Milestones) will not be <br />extended due to delays within the control of <br />CONTRACTOR. Delays attributable to and within the <br />control of a Subcontractor or Supplier shall be deemed to be <br />delays within the control of CONTRACTOR. <br /> <br />12.05 Delays Beyond OVtWER's alld CONTrv1CTOR's <br />Con/rol <br /> <br />A. Where CONTRACTOR is prevented from complet- <br />ing any part of the Work within !he Contract Times (or <br />Milestones) due to delay beyond the control of both OWNER <br />and CONTRACTOR, an extension of the Contract Times (or <br />Milestones) in an amount equal to the time lost due to such <br />delay shall be CONTRACTOR's sole and exclusive remedy <br />for such deJay. <br /> <br />12.06 Delay Damages <br /> <br />A. In no event shall OWNER or ENGINEER be liable <br />to CONTRACTOR, any Subcontractor, any Supplier, or any <br />other person or organization, or to any surety for or <br />employee or agent of any of them, for damages arising out of <br />or resulting from: <br /> <br />1. delays caused by or within the control of CON- <br />TRACTOR; or <br /> <br />2. delays beyond the cootrol of both OWNER and <br />CONTRACTOR including but not limited to fires, <br />floods, epidemics: abnormal weather conditions, acts of <br />God, or acts or neglect by utility owners or other <br />contractors perfo!Illing other work as contemplated by <br />Article 7. <br /> <br />B. Noching in tillS paragraph 12.06 bars a change in <br />Contract Price pursuant to this Article 12 to compensate <br />CONTRACTOR due to delay, interference, or disruption <br />directly attributable to. actions or inactions of OWNER or <br />anyone for whom OWNER is responsible. <br /> <br />ARTICLE 13 - TESTS AND INSPECTIONS; <br />CORRECTION, REMOVAL OR ACCEPTANCE OF <br />DEFECTIVE WORK <br /> <br />13.01 Notice oj Defects <br /> <br />A. Promp~ notice of all defective Work: of which <br />OWNER or ENGINEER has actual knowledge will be given <br /> <br />to CONTRACTOR. All defective Work may be rejected, <br />corrected, or accepted as provided in this Article 13. <br /> <br />13 ,02 Access to Work <br /> <br />A. OWNER, ENGINEER, ENGINEER's Consultants, <br />other representatives and persOIUlel of OWNER, i.ndependent <br />testing laboratories, and govenunental agencies with <br />jurisdictional interests wiIl have access to the Site and the <br />Work at reasonable times for their observation, inspecting, <br />and testing. CONTRACTOR shall provide them proper and <br />safe conditions for such access and advise them of <br />CONTRACTOR's Site safelY procedures and programs so <br />that they may comply therewith as applicable. <br /> <br />13.03 Tests and Inspections <br /> <br />A. CONTRACTOR shall give ENGINEER timely <br />notice of readiness of the Work for all required inspections, <br />tests, or approvals and shall cooperate wich inspection and <br />testing personnel to facilitate required inspections or tests. <br /> <br />B. OWNER shall employ and pay for the services of an <br />independent testing laboratory to perform all inspections, <br />tests, or approvals required by the Contract Documents <br />except: <br /> <br />1. for inspections, tests, or approvals covered by <br />paragraphs I3.03.C and 13.03.D below; <br /> <br />2. that costs incurred in connection with tests or <br />inspections conducted pursuant to paragraph 13.04.B <br />shall be paid as provided in said paragraph 13.04.B; and <br /> <br />3. as ocherwise specifically provided in the Con- <br />tract Documents. <br /> <br />.C. If Laws or Regulations of any public body having <br />jurisdiction require any Work (or part thereof) specifically to <br />be inspected;1ested, or approved by an employee or other <br />representative of such public body, CONTRACTOR shall <br />assume full responsibility for arranging and obtaining such <br />inspections, tests, or approvals, pay all.costs in connection <br />therewith, and furnish ENGINEER the required certificates <br />of inspection or approval. <br /> <br />D. CONTRACTOR shall be responsible for arranging <br />and obtaining and shall pay all costs in connection with any <br />inspections, tests, or approvals required for OWNER's and <br />ENGINEER's acceptance.of materials or equipment to be <br />incorporated in the Work; or acceptance of materials, mix <br />desfgns, or equipment submitted for approval prior to <br />CONTRACTOR's purchase thereof for incorporation in the <br />Work. Sucb inspections, 1Csts, or approvals shall be <br />performed by organizations acceptable to OWNER and <br />ENGINEER. <br /> <br />00700 - 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.