My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1221
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:35 AM
Creation date
3/17/2008 9:44:27 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1221
Date (mm/dd/yyyy)
02/21/2008
Description
Southeastern - Central Island Drainage Proj Agrmt (Bid 07-10-02) ($3,635,852.02)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />amounts, then OWNER shall be responsible for payment of the full amount of the deductible in <br />the event of a paid claim." <br /> <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br /> <br />Add the following after Paragraph 6.05.F: <br /> <br />"G. The use of asbestos or asbestos-based fiber materials is prohibited in this Project." <br /> <br />Add the following after Paragraph 6.08: <br /> <br />"6.08.A. The OWNER will secure and pay for only the following governmental charges and inspection <br />fees: <br /> <br />a. special assessments, <br />b, capital connection fees, <br />c. threshold and special inspection fees, <br />d. permanent utility meter installation fees, <br />e. permanent utility hook-up fees, and <br />f. impact fees, <br /> <br />6.08.8. CONTRACTOR shall pay for all building permits and charges of utility owners for <br />connections to the Work, and OWNER will pay charges of such utility owners for capital costs <br />related thereto such as plant investment fees." <br /> <br />Add the following after the last sentence in Paragraph 6.10: <br /> <br />In accordance with Exhibit A hereto, entitled Tax Exemption Agreement to Contract, the Owner <br />may directly purchase all materials and equipment identified in the Contract Documents for <br />incorporation into the Project ("Owner-Provide Materials"). <br /> <br />Delete the last sentence of Paragraph 6.12. and substitute the following: <br /> <br />"These shall be available to ENGINEER for examination during construction and shall be <br />delivered "to ENGINEER for OWNER upon Substantial Completion of the Work." <br /> <br />At the end of Paragraph 6,13.8, add the following sentences: <br /> <br />"The Occupational Safety and Health Administration excavation safety standards, 29 CFR <br />1926.650 Subpart P trench safety standards are in effect during the period of construction of the <br />Project. In compliance with current State of Florida statutes, the Contractor or subcontractor <br />performing trench excavation work on the Project shall comply with the applicable trench safety <br />standards. " <br /> <br />In the sixth line of Paragraph 6.20.A., change the parenthetical insert to read as follows: <br /> <br />"...(including but not limited to fees and charges of ENGINEER, other engineers, architects, <br />attorneys and other professionals, particularly including, but not limited to reasonable <br />ENGINEER's attorney's fees, and court costs)...". <br /> <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION <br /> <br />Oct. 2007 SUPPLEMENTARY CONDITIONS <br /> <br />00800-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.