Laserfiche WebLink
<br />COSTS TO THE SCHOOL AND CITY FOR THE 88-1 SITE <br /> <br />WITH DRAINAGE City: $454,065 <br />School: $544,156 <br /> <br />183rd Street (Atlantic to North Bay) <br /> <br />182nd Street (Atlantic to North Bay) <br /> <br />Revised: March 5, 2008 <br /> <br />WITHOUT DRAINAGE City: $153,243 <br />School: $162,325 <br /> <br />North Side Curb & Gutter = $9,447 (City) <br />South Side Curb & Gutter = $9,477 (School) <br />Asphalt Pavement = $8,987 (School) <br />North Side Sidewalk = $11,920 (City) <br />South Side Sidewalk = $9,230 (School) <br /> <br />North Side Curb & Gutter = $34,640 (School) <br />South Side Curb & Gutter = $34,640 (City) <br />Asphalt Pavement = $32,722/16,361 <br />(half School, half City) <br />North Side Sidewalk = $33,790 (School) <br />South Side Sidewalk = $33,790 (City) <br /> <br />Atlantic Boulevard (182nd Street to 183rd) West Side Curb & Gutter = $24,933 (School) <br />East Side Curb & Gutter = $24,933 (City) <br />Asphalt Pavement = $6,453 /$3,226 <br />(half School, half City) <br />West Side Sidewalk = $24,349 (School) <br />East Side Sidewalk = $0.00 (No One) <br /> <br />North Bay Road (182nd Street to 183rd) West Side Curb & Gutter = $6,935 (City) <br />East Side Curb & Gutter = $6,935 (School) <br />Asphalt Pavement = $6,536 (City) <br />West Side Sidewalk = $8,711 (City) <br />East Side Sidewalk = $6,758 (School) <br /> <br />Five Onsite Wells and Drainage System = $381,831 (School) <br /> <br />Three remaining Wells and Drainage System = $300,822 (City) <br /> <br />NOTE: Included in the Wells and drainage costs are limerock, inlets, 18" diameter concrete pipe was used as average. <br />The City cost on this item is higher because of 17 inlets on the City side of the street vs. 10 inlets on School side. <br />Signage and striping were not tabulated as is not a significant number. <br />