My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1231
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:39 AM
Creation date
6/12/2008 3:54:31 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1231
Date (mm/dd/yyyy)
02/21/2008
Description
AT&T Agrmt for Phase I WiFi ($242,115.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />INSTAllATION <br />AT&T's partner Meisner Datacom will provide services and materials as described in the Installation section. The Installation Scope of work is based <br />on documentation provided by the Customer and a site survey conducted by Meisner Datacom, A T& T representatives and the Customer. <br /> <br />· All work will be performed in accordance with local codes governing the installation of new wire and cable used for electrical and/or <br />communications purposes. If no local code exists, pertinent sections of the National Electrical Code of 2008 will be observed. <br /> <br />. All materials shall be UL listed and approved. <br />. All poles shall be installed with a pre-cast concrete base. <br />· Poles do not include electrical arm and/or light fixture. <br />· Provide wind load certification. (Additional engineering charges may apply if City of Sunny Isles requests wall composition for roof mast install). <br />· Pole manufacturer will not commit to delivery date until firm order has been placed - normally takes four to six weeks. <br /> <br />A T& T will place equipment order upon receipt of signed BICS contract. <br /> <br />· All pole locations must be identified by AT&T with concurrence from Customer prior to project commencement and pending public underground <br />locator clearance to be performed by Sunshine Locators. <br />Provide and install 120V power outlets feeding antennas and Access Points - excluding outlets located at City Hall roof which will be installed by <br />the City. <br /> <br />· Provide all safety traffic cones and barricades as needed. <br /> <br />· It is assumed existing conduits at Pier Park are in good working condition. <br />It is assumed that all locations have sufficient power. <br /> <br />A T& T assumes there are no abnormal environmental or hazardous conditions on the Customer's premise which would require extraordinary safety <br />and/or regulatory functions, activities, permits or certifications in order for AT&T to perform the required work. <br />A T& T and our installation contractor Meisner Datacom will abide by the City Of Sunny Isles Beach Wireless Island Network Services Agreement <br />with AT&T Business Systems for Completion of Phase 1 of the Wireless Island. <br /> <br />City Hall <br /> <br />~ Provide and install one (1) wall mounted 15ft mast and one (1) wall mounted 5ft mast at city hall roof. <br />~ Install 15 ft mast to side of existing block wall near others for Access Point, utilize existing weatherhead/raceway and electrical circuit at roof. <br />Second Access Point to be located at Southeast corner of roof, electrical circuit shall be installed by Customer to existing outlet located on <br />North side of roof. <br /> <br />~ Install two (2) Access Points. <br />~ Install two (2) antennas. <br /> <br />. Gilbert Samson Oceanfront Park <br /> <br />~ Provide and install one (1) 22' 6" aluminum pole, painted black - per Customer provided document. <br />~ Install three (3) Access Points, one (1) pole mounted and two (2) wall mounted. <br />~ Install one (1) Access Point mounted to existing restroom building near beach, power available at vending machine area of building & on <br />rooftop, and a second Access Point located near roadway at northwest corner, pole to be located near fence behind existing flagpole area, <br />trench approximately 30 ft to junction box, assume existing circuit available for use. <br /> <br />Senator Gwen MarQolis Park <br />).> Provide and install one (1) 22' 6" aluminum pole, painted black - per Customer provided document. <br />~ Pole to be located near center of park, approximately 50 ft trench to existing electrical panel. <br />~ Install one (1) Access Point. <br /> <br />Town Center Park <br /> <br />~ Provide and install one (1) 22' 6" aluminum pole, painted black - per Customer provided document. <br />).> Pole to be located just east of existing Gazebo structure, trench approximately 30 ft to existing junction box at Gazebo, pull approximately <br />175-200 ft through existing raceway to electrical panel. <br />~ Install one (1) Access Point. <br /> <br />Pier Park <br /> <br />~ Install two (2) Access Points onto existing city owned electrical poles. <br />~ One Access Point will be mounted to existing light pole at parking lot entrance, and a second one will be mounted on another existing light <br />pole at utility building near beach entrance, will need to pull additional constant hot circuit through Qty 8 - 10 existing light poles to electrical <br />panel, each pole spaced approximately 40 ft. <br /> <br />Scope of Work <br />Created on 03/06/08 <br />Created By: Rita Baas <br />AT&T Proprietary Document <br /> <br />Page 3 of 6 <br />Not for disclosure to 3rd parties without prior written permission <br />Initials Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.