Laserfiche WebLink
<br />270000-R2 <br />Mr. A. John Szerlag <br />June 12, 2008 <br />Page 4 <br /> <br />TABLE 1 <br />SUMMARY OF COSTS FOR CONSULTING ENGINEERING SERVICES <br />CITY OF SUNNY ISLES BEACH COASTAL STRUCTURES, FLORIDA <br /> <br />~J <br />~ <br /> <br /> . (' <br /> /VOl d-u G'" <br /> DESCRIPTION ItH-Al cost <br />1. Phase I - Shoreline Stabilization Study <br />a) Data Collection and Review Based on the Attached $2,000 <br /> Hourly Rate Schedule <br />b) Hydrographic Survey Based on the Attached $5,600 <br /> Hourly Rate Schedule <br />c) Base Map Based on the Attached $2,500 <br /> Hourly Rate Schedule <br />d) Wave Modeling Based on the Attached $18,800 <br /> Hourly Rate Schedule <br />e) Sediment Transport Evaluation Based on the Attached $13,200 <br /> Hourly Rate Schedu Ie <br />f) Evaluation of Critical Areas Based on the Attached $4,200 <br /> Hourly Rate Schedule <br />g) Initial Shoreline Stabilization Plan Based on the Attached $5,700 <br /> Hourly Rate Schedule <br /> Subtotal: $52,000 <br />2. Client-Directed Meetings Based on the Attached $1,500 <br /> Hourly Rate Schedule <br /> Subtotal: $1,500 <br /> SUBTOT AL FEES: $53,500 <br /> STANDARD EXPENSES 8.5% $4,548 <br /> TOT AL FEES NOT TO EXCEED: $58,048 <br /> <br />Coastal, Environmental, Civil Engineering and Management <br />