My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1280
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:45 AM
Creation date
6/26/2008 5:29:55 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1280
Date (mm/dd/yyyy)
06/19/2008
Description
MD Water & Sewer Sanitary Sewage Facilites Agrmt ($145,967.25)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SUNNY ISLES BEACH CGA PROJECT 05-4893, 10# 20124 <br /> <br />daily gallons per day for the various building units and/or use as shown on Exhibit "B" <br /> <br />attached hereto and made a part hereof, multiplied by the applicable rate established by <br /> <br />the COUNTY. The CITY intends to connect to the COUNTY'S sewer system sixty-one (61) <br /> <br />existing single-family residences currently connected to the NMB water system. Therefore, <br /> <br />the agreed total average daily gallonage is twenty-one thousand three hundred fifty <br /> <br />(21,350) gallons, resulting in a sewer connection charge in the amount of one hundred <br /> <br />nineteen thousand five hundred sixty dollars ($119,560.00), which amount shall be paid by <br />, <br /> <br />the CITY to the DEPARTMENT with the execution of this Agreement. The CITY <br /> <br />acknowledges that, in the event the connection charge per gallon as specified herein <br /> <br />increases prior to provision of service to the property, the CITY shall pay to the <br /> <br />DEPARTMENT the difference between the connection charge previously paid and the <br /> <br />connection charge as would be due as computed using the increased rate. The <br /> <br />DEPARTMENT'S current sewer connection charge rate is five dollars and sixty cents <br /> <br />($5.60) per gallon per day. The sewer connection charge rates are subject to revision by <br /> <br />the Board of County Commissioners at any time. The DEPARTMENT shall not, under any <br /> <br />circumstances, render sewer service to the property until such time as the fees and/or <br /> <br />charges specified herein have been paid in full. <br /> <br />5. OTHER USES ON THE PROPERTY. If the CITY constructs buildings other <br /> <br />than those outlined in paragraph 4 above, or otherwise changes the use of structures built <br /> <br />such that paragraph 4 is no longer an accurate description of the uses at the CITY'S <br /> <br />property, the COUNTY shall determine if additional capacity is needed, as calculated using <br /> <br />Exhibit "B" attached hereto. If additional capacity is required, connection charges, <br />
The URL can be used to link to this page
Your browser does not support the video tag.