Laserfiche WebLink
<br />Rick: <br /> <br />Below is a breakdown of the costs of the design, construction and CEI for the countdown signal heads <br />replacements: <br /> <br />Construction: <br />Direct Construction: $71,012.00 <br />Contingency 25% <br />Total $88,765.00 <br /> <br />CEI <br /> <br />Two Weeks $16,000.00 <br />Design <br />Design & Survey, <br />Signed &Sealed $24,410,00 <br /> <br />Grand Total $129,165.00 <br /> <br />Please review these figures, and provide comments. <br /> <br />Thanks, <br /> <br />Edwin F. Mojena, P.E. <br />Design Manager <br />Marlin Engineering, Inc. <br />2191 NW 97 Avenue <br />Miami, Florida 33172 <br />TEL: 305-477-7575 <br />FAX: 305-477-7590 <br />lS emoiena@marlinenqineerinq.com <br /> <br />Attachment "A" <br />