Laserfiche WebLink
<br /> <br />lBe~swenge!r, Hoch and Associates <br /> <br />CONSUL TING ENGINEERS. ARCHITECTS AND PLANNERS <br /> <br />July 9, 2008 <br /> <br />Mr. Rick Conner <br />Engineering and pUblic Works Director <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach. FL 33160 <br /> <br />RE: Additional Pre-Construction and CEI Services <br />Central Island Drainage and Street Improvements <br /> <br />Dear Mr. Conner: <br /> <br />This letter presents our additional cost estimate to provide pre-construction and construction engineering <br />and inspection (CEI) services for the referenced construction project. This cost estimate is summarized as <br />follows from the attached Exhibit A: <br /> <br />1. Bidding assistance and technical services in support of legal challenge to <br />bid process (in excess of First Amendment) ................................................................$10,080 <br /> <br />2. CEI services on NE 183rd Street (MCM Contractors)...................................................$46,800 <br /> <br />3. Technical services for pre-construction and CEI services for initial <br />construction on Central Island drainage (Southeastern). .............................................$39,600 <br /> <br />4. CEI services on Central Island drainage including landscaping, lighting and <br />Gwen Margolis Park (Southeastern) (in excess of Third Amendment) ...................... $245,643 <br /> <br />5. Design services for Central Island lighting, landscaping, park and drainage <br /> <br />improvements.................................................................. .......................... ................... $97,872 <br /> <br />6. Total- Additional CEI fee requested .......................................................................... $439.995 <br /> <br />The above items are to be administered and invoiced as hourly contracts with their respective not-to- <br />exceed limiting amounts. <br /> <br />Due to the increase in the Scope of Work and additional construction items, the CEI will now require two <br />positions (to be staffed by Pat Hayes and George Sokola). <br /> <br />The additional construction items involve construction of curb and gutter, park drainage, landscaping, <br />street lighting and NE 183rd Street. <br /> <br />Because of the initial construction delays, we are showing an additional 3 months to the construction time <br />making the overall construction schedule to be an estimated 16 months. (NTP to the contractor was issued April <br />1, 2008; estimated construction end date is July 31, 2009.) The contractor has not yet made a time extension <br />request. <br /> <br />A contingency of 15% is being shown in the additional fee for Item NO.4. <br /> <br />Should you need additional information on the project, or have any questions, please do not hesitate to <br />contact me at (305) 944-5151. <br /> <br />Sincerely yours, <br />BEISWENGER, HOCH AND ASSOCIATES, INC. <br />'? U- t1. D~____ <br /> <br />Robert B. Deuser <br />Vice President <br /> <br />RBDllss <br />xc: Pat Hayes <br />Hugo Guevara <br /> <br />ATTACHMENT "A" <br /> <br />1190 NE 163<<j Street, SUite :!03. North Mlarrll Beacn. F~ 33' 62 0 (30:'! ~;JJ :,1 :,1 0 rea' 1:\(5) \)48;~290 0 www hhiJp.n~Hlp.er!' cmn <br />