My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1302
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:46 AM
Creation date
8/4/2008 12:26:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1302
Date (mm/dd/yyyy)
07/17/2008
Description
LIVS - Pelican Park Architectural Svcs Agrmt ($48,830.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />July 8, 2008 <br />Rick Conner <br />Sunny Isles Beach <br />Public Works <br />Page 2 of2 <br /> <br />II. BASIC SERVICS <br /> <br />A. SCHEMATIC DESIGN PHASE <br /> <br />LIVS Associates will assist the client in developing a program analysis, which identifies <br />all the components required for the project. We will present a complete layout of the <br />design consisting offIoor plans, elevations, and other documents as required to convey the <br />design scheme. <br /> <br />B. CONSTRUCTION DOCUMENTS PHASE <br /> <br />Based upon an approved design scheme, construction documents will be prepared which <br />define the materials. components and building systems for the project. The completed <br />construction documents shall include civil, structural. architectural, mechanical, and <br />electrical drawings as required to obtain a building pennit, as well as bids from qualified <br />contractors. <br /> <br />C. CONSTRUCTION ADMINISTRATION PHASE <br /> <br />LIVS Associates will provide services during construction to include: review of contract <br />submittals; responses to questions (RFIs), and issuance of clarifications related to our <br />documents. One monthly visit will be perfonned for observation of the work to assist the <br />client in monitoring the progress of the work and compliance with the requirements of <br />the contract documents. During this visit LIVS Associates will review the contractor's <br />request for payments. This phase also includes a final inspection, punch list, and <br />contract closeout. Additional visits beyond those stipulated above \~1l be perfonned as <br />an additional service (Refer to Section III-B). <br /> <br />m. FEE SCHEDULE Mrn PAYMENT <br /> <br />A. BASIC SERVICES <br /> <br />LIVS will provide professional services for the above referenced project, consisting of <br />the scope and basic services previously outlined for the stipulated fee of $48,830.00 <br />(forty eight thousand, eight-hundred and thirty). This fee will be divided as follows: <br /> <br />Basic Services Percentage of Fee* Amount <br />· A. Schematic Design Phase 20% $ 9,766.00 <br />· B. Construction Document Phase 65% $31,740.00 <br />· C. Construction Admin. Phase 15% $ 7,324.00 <br />TOTAL 100% $ 48,830.00 <br />'" Paymenrs for basic services will be made upon work completed and made <br />in proportion to the services performed in each phase so that the payments <br />for Basic Compensationfor each phase shall equal/he percentages shown <br />above of the total compensation payable. <br /> <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.