My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1323
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1323
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:53 AM
Creation date
4/23/2009 2:32:52 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1323
Date (mm/dd/yyyy)
09/18/2008
Description
Award RFP 08-07-01 & Agmt w/Ashbritt, Inc. for Emergency Debris Disposal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />The Contractor must provide sufficient equipment and labor to accomplish clearing of primary rights-of-way <br />within 24 hours of receiving Notice to Proceed. Failure to clear the primary rights-of-way will result in the <br />Contractor remitting to the City liquidated damages in the amount of the cost per hour of each clearing crew <br />as defined in Part B of the Fee Schedule Form (Paragraph 7.14) for each hour exceeding the 24 hour cutoff <br />plus 25% of the hourly rate as a premium to secure additional work crews from other resources to complete <br />the work immediately following the disaster. <br /> <br />The City Debris Manager reserves the right to discontinue the clearing operations as he deems necessary. <br />Extension of the clearing operations past the 70 hours must be approved in writing by the City Debris <br />Manager.. <br /> <br />5.7.2. Removal Operations <br /> <br />The Contractor must begin debris removal operations within 48 hours of receiving the Notice-to-Proceed <br />and be underway in all zones within three (3) days. Schedules for all other roads/streets will be determined <br />in concert with the City Debris Manager and the Contractor's representative. Removal may begin earlier <br />and, if approved by the City Debris Manager, may be combined with public rights-of-Way clearing <br />operations, provided the equipment so used will be billed on a unit cost basis rather than on a time and <br />materials basis. The City Debris Manager reserves the right to increase or decrease the scope of the <br />removal activity as he/she deems necessary to ensure effective management of the overall debris <br />removal/disposal operations. <br /> <br />5.7.3. Working Hours <br /> <br />Unless otherwise permitted by the City Debris Manager. working hours for removal operations shall be <br />limited to daylight hours. The Contractor is responsible for coordinating with the City Debris Manager in the <br />event weather conditions delay or modify the proposed daily schedule. <br /> <br />The Contractor shsll ensure that wherever non-English spealcJng crew. are utilized, at least one <br />crew supervisor must be fluent In En Ilsh. <br /> <br />5.8. EXTRA WORK <br /> <br />At the City Debris Manager's option, the scope of work for Phase 1, Clearing, may be expanded to include clearing <br />on the Federal Aid System roadways within the City's jurisdiction and for Phase 2, Removal, may be expanded to <br />include public parks, other recreational areas. drainage structures and channels, and sand removal all subject to the <br />prices noted in the Fee Schedule Form (Paragraph 7.14). <br /> <br />5.9. MEASUREMENT AND PAYMENT <br /> <br />5.9.1. PHASE 1 COMPENSAnON. nME AND MATERIALS BASIS <br /> <br />Compensation for Phase 1 Debris Clearing will be measured and paid for based on an hourly rate only <br />when equipment is actively operating and documented by equipment logs and operator timesheets <br />submitted to the City. The hourly rate for each type of equipment must include all subsidiary costs including <br />mobilization and demobilization. fuel, maintenance. operator, overhead and profit. The Contractor must <br />provide, as part of the Price Proposal, a list of basic equipment to be used for clearing operations and the <br />hourly rate to be charged for each. <br /> <br />5.9.2. PHASE 2 COMPENSA nON. UNIT PRICE PER CUBIC YARD OR TON BASIS <br /> <br />Debris removal will be paid for on the basis of a unit price per cubic yard or ton for all debris loaded, hauled, <br />and dumped at an approved landfill. The unit price per cubic yard must include all subsidiary costs, <br />including mobilization and demobilization, labor, equipment, fuel. maintenance, overhead and profit. <br />Compensation will be based solely on the volume or tonnage of debris hauled as documented by completed <br />load tickets administered and validated by City loading site and disposal site monitors. <br /> <br />.~ \ B <br />
The URL can be used to link to this page
Your browser does not support the video tag.