Laserfiche WebLink
No.6 - Vines <br />6a. Thunbergia grandiflora Each $ 10.30 <br />No.7-Soils and Soil Amendments <br />7a DIEHARD for Shrubs and <br /> Groundcovers Oz $ 0.31 <br />7b. DIEHARD for new Trees Oz $ 0.31 <br />7c. DIEHARD for new Palms Oz $0.31 <br />7d. DIEHARD for Relocated Palms Oz $ 0.31 <br />7e. Planting Soil Mix CY $38.65 <br />7f. Mulch CY $ 43.21 <br />7g. Tree removal Each tree $ 200.00 <br />71t. Palm removal Each palm $ 130.55 <br />7i. Palm Relocation Each tree $203.79 <br />7j. Existing trees to remain <br /> Protection Each tree $ 10.00 <br />7k. Aluminum landscape edging LF $ 7.12 <br />71. Gravel path SF $ 0.65 <br /> <br />No.8 - Irrigation <br />Ba. Unit price to include all components <br />of Irrigation System <br /> <br />No.9 - Pavement <br /> <br />9a. Standard concrete: SF <br />9b. Integral color concrete: SF <br />9c. Concrctc curbs: LF <br />ge. Concrete pavers: SF <br />9f. Engraved concrete pavers: Each <br />9g. Stainless steel/TerraZ7.o <br /> paving inserts: Each <br />9h. Stone band and flagging at <br /> concrete edge paving: SF <br />9i. Stone flagging path: SF <br />9j. Stone curb/edging: LF <br />9k. Exfiltration pits <br /> (in stone flagging): Each <br />91. Stone pcbble: SF <br />9m. Trap Sand (sand pits): CY <br />9n. Ipc (FCS certified wood): SF <br />90. Playground safety surface: SF <br />9p. J\I)A detectable <br /> warning surface: SF <br /> <br />No. 10 - Stairs and Ramps <br />lOa. Concrete stairs: LF <br />lOb. Stainless steel stair handrails: <br />IOc. Stainless steel ramp handrails: <br /> <br />Each <br />Each <br /> <br />$ 54,691. 00 <br /> <br />$ 5.00 <br />$ 6.50 through $13.50 <br />$ 1113.50 II <br />$ 14.97 <br />$ TBD <br /> <br />$ 2,335 <br /> <br />$ 17.25 <br />$ 18.73 <br />$ 8.45 <br /> <br />$ 18.73 <br />$ 0.37 <br />$ 1. 91 <br />$ 34.57 <br />$ 21,186 <br /> <br />$ 10.00 <br /> <br />$ 50.00 <br />$ 617.00 <br />$ ',487 <br /> <br />BID FORM-Page 4 <br />