My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2587
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2587
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2016 4:14:34 PM
Creation date
9/29/2016 4:14:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2587
Date (mm/dd/yyyy)
09/15/2016
Description
Ratify 3rd Amd to Agmt w/Craig A. Smith & Assoc. Engineering Srvs 174th St. Impr.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:rs <br /> 2.1^,F City of Sunny Isles Beach t7- <br /> ,^j . -t 18070 Collins Avenue <br /> "NSunny Isles Beach, Florida 33160 <br /> i� ` o'C.;t 4' (305)947-0606 City Hall <br /> c''' o. St '" (305)949-3113 Fax <br /> MEMORANDUM <br /> TO: The Honorable Mayor and City Commission <br /> VIA: Christopher J. Russo, City Manager <br /> FROM: Elka Linton-Dorsett, Capital Projects Manager <br /> DATE: 9/15/2016 <br /> Ratifying the Third Amendment to the Agreement with <br /> RE: Craig A. Smith to Provide Engineering Services for the <br /> Reconstruction of the 174th Street Roadway <br /> Improvement Project <br /> RECOMMENDATION: <br /> Staff is recommending the City Commission approve the attached <br /> resolution. <br /> REASONS: <br /> Craig A Smith is the Engineer of Record for the on-going 174th St <br /> project. Their scope of services has included Engineering Services for <br /> design and construction, as well as provision of a full time Senior Field <br /> Representative for on-site construction observation. Resolution 2015- <br /> 2400, which approved the 2nd amendment to the Craig A Smith <br /> contract, adding Construction Phase services, was based on an 11- <br /> month construction duration. Due to multiple factors, including but not <br /> limited to inclement weather, coordination with non-City owned utilities <br /> and modifications to the original construction scope of work, it is now <br /> necessary to extend the original contract duration by 6-months. This <br /> extension will bring the Consultants contract it in line with the <br /> Contractor's projected completion schedule. <br /> FUNDING SOURCE: <br /> 252 <br />
The URL can be used to link to this page
Your browser does not support the video tag.