My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' may or may not as it is an interior street. The contractor coordinates it and the City <br />will pay for it. If you are going to obstruct the entrance on Collins and have lane <br />' closures you may have to have Police, but we will meet with Robert Solera who is in <br />charge of traffic here. <br />' 54. A special time to perform work in that section there? <br />As quickly as possible, the quicker the better, the City does not have any set time but <br />you might want to do it at night to alleviate connections, etc. This is why you must <br />bring your MOT to DOT because we don't know how much you will need to encroach <br />in there. <br />55. What color for sidewalk? <br />No sidewalk there at all. <br />We would like to get feedback from you on how you envision this project going along, <br />opening and closing sections as you go, or gutting it out all at once. It is depending on <br />time constraints, it would be faster to gut it all out at once, but we don't want any holes. <br />56. In October there is high tide, would you consider another time, as the water is a foot higher <br />than it is now. <br />The Mayor, an ex- Commissioner, and a new Commissioner lives there, and we would <br />like to give them a realistic timeline. If you piecemeal it, it is going to take longer, but <br />if you tear it up all at once you may be able to do it faster. It is either or. <br />57. Will we get a copy of the sign -in sheets? <br />Yes, it will be part of the Addendum. It will be sent out in a couple of days. <br />The Pre -Bid Conference was concluded at 10:53 a.m. <br />08 -06-01 Pre -Bid Conference QA Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.