My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />where applicable, and the appurtenant items for which separate payment is <br />not specifically included in the Bid Schedule. <br />' 3. Conflict structures will include pipe sleeve, if required. <br />' C. Connect to Existing Drainage Pipe <br />1. Measurement for payment for connecting to drainage pipes will be based <br />' upon the actual quantity, each, of such connections, all in accordance with <br />the requirement of the Contract Documents. <br />2. Payment for removal and disposal of existing drainage structures will be <br />made at the unit price, each, named in the Bid Schedule, which price shall <br />constitute full compensation for the removal and disposal of each catch basin <br />or storm maintenance structure, including backfilling and all restoration work. <br />F. Furnish and Install Asphalt Concrete Pavement <br />1. Measurement for payment of asphalt concrete pavement will be based upon <br />the number of square yards of such asphalt concrete pavement actually <br />constructed, as detailed in the Drawings, all in accordance with the Contract <br />Documents, <br />2. Payment for placement of asphalt concrete pavement and the thickness <br />indicated will be made at the unit price per square yard for such placement as <br />' 05/08 01025 -3 <br />05 -4893 <br />2. Payment for connecting to existing drainage pipes will be made at the unit <br />' <br />price, each, named in the Bid Schedule, which price shall constitute full <br />compensation for the completed installation of the connection including but <br />not limited to excavation, dewatering, backfill and compaction, removing <br />' <br />existing knockout plug where applicable, saw cutting, grouting, construction <br />of the connection, restoration, all else necessary for a complete and <br />functional installation, and the appurtenant items for which separate payment <br />' <br />is not specifically included in the Bid Schedule. <br />D. Remove and Dispose of Existing Drainage Pipe <br />1. Measurement for payment to remove and dispose of existing drainage pipe <br />will be based upon the actual number of linear feet of such pipe actually <br />' <br />removed all in accordance with the Contract Documents. <br />2. Payment for removal and disposal of existing drainage pipe will be made at <br />' <br />the unit price per linear foot of pipe named in the Bid Schedule, which price <br />shall constitute full compensation for the removal and disposal of such <br />drainage pipe including backfilling and all restoration work. <br />' <br />E. Remove and Dispose of Existing Drainage Structure <br />1. Measurement for payment to remove and dispose of existing drainage <br />' <br />structures will be based upon the actual number, each, of such structures <br />actually removed all in accordance with the Contract Documents. <br />2. Payment for removal and disposal of existing drainage structures will be <br />made at the unit price, each, named in the Bid Schedule, which price shall <br />constitute full compensation for the removal and disposal of each catch basin <br />or storm maintenance structure, including backfilling and all restoration work. <br />F. Furnish and Install Asphalt Concrete Pavement <br />1. Measurement for payment of asphalt concrete pavement will be based upon <br />the number of square yards of such asphalt concrete pavement actually <br />constructed, as detailed in the Drawings, all in accordance with the Contract <br />Documents, <br />2. Payment for placement of asphalt concrete pavement and the thickness <br />indicated will be made at the unit price per square yard for such placement as <br />' 05/08 01025 -3 <br />05 -4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.