My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 05/08 01025 -5 05 -4893 <br />2. Payment for furnishing and installing of limerock base material will be made <br />' <br />at the unit price per cubic yard at the depth indicated and named in the Bid <br />Schedule, which price shall constitute full compensation for applying prime <br />' <br />coat and furnishing all such material, in place, including all transportation, <br />handling, cleaning, positioning and compacting of said bedding to a Load - <br />Bearing -Ratio of One - hundred (LBR 100), and disposal of waste or <br />unsuitable material. <br />' <br />1. Measurement for payment for clearing and grading swale will be based upon <br />J. Compaction /Stabilization of Subgrade <br />t <br />1. Measurement for payment for compaction /stabilization of subgrade will be <br />based upon the number of square yards of such materials actually <br />compacted, all in accordance with the Contract Documents. <br />' <br />shall constitute full compensation, including earthwork, importing of fill <br />2. Payment for compacting /stabilizing of subgrade will be made at the unit price <br />per square yard named in the Bid Schedule, which price shall constitute full <br />' <br />compensation for handling, cleaning, positioning and compacting of said <br />bedding to a Load - Bearing -Ratio of Forty (LBR 40), importing fill material and <br />disposal of excess waste or unsuitable material. <br />' <br />K. Furnish and Install Curb, Curb and Gutter and /or Valley Gutter <br />' <br />1. Measurement for payment for furnishing and installing curb, curb and gutter, <br />and /or valley gutter will be based upon the number of linear feet of such <br />curbing actually constructed as determined by measurement along the <br />centerline of the curb in place, all in accordance with the Contract <br />' <br />Documents. <br />1 05/08 01025 -5 05 -4893 <br />2. Payment for furnishing and installing curb, curb and gutter, and /or valley <br />' <br />gutter will be made at the unit price per linear foot of such curbing named in <br />the Bid Schedule, which price shall constitute full compensation for complete <br />installation including grading, placing 4" limerock pad, forming, saw cutting of <br />pavement and cleanup of all areas disturbed by this construction. <br />L. Clear and Grade Swale <br />' <br />1. Measurement for payment for clearing and grading swale will be based upon <br />the number of square yards of swale actually cleared and graded, all in <br />accordance with the Contract Documents. <br />2. Payment for clearing and grading swale will be made at the unit price per <br />square yard of clearing and grading named in the Bid Schedule, which price <br />' <br />shall constitute full compensation, including earthwork, importing of fill <br />material, removal and disposal of excess material including but not limited to <br />brush, bollards, shrubs, concrete, sod, and protection of trees to remain. <br />' <br />Swale is defined as the area between the edge of pavement to the right -of- <br />way line, excluding all driveway aprons and concrete sidewalks. <br />1 05/08 01025 -5 05 -4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.