Laserfiche WebLink
SECTION 01046 <br />' MODIFICATIONS TO EXISTING STRUCTURES, PIPING AND EQUIPMENT <br />PART 1 - GENERAL <br />1.01 WORK INCLUDED <br />' A. Furnish all labor, materials, equipment and incidentals required to modify, alter <br />and convert existing structures as shown or specified and as required for the <br />' installation of new mechanical equipment, piping and appurtenances. Work shall <br />be performed within the requirements of Special Project Procedures in Section <br />01030 and required Construction Scheduling in Section 01310. Existing piping <br />' and equipment shall be removed and dismantled as necessary for the <br />performance of structural alterations in accordance with the requirements herein <br />specified. <br />' 1.02 RELATED WORK <br />' A. Section 01045: Cutting and Patching <br />PART 2 - PRODUCTS (Not Used) <br />' PART 3 - EXECUTION <br />3.01 GENERAL <br />' A. The Contractor shall cut, repair, reuse, excavate, demolish or otherwise remove <br />parts of the existing structures or appurtenances, as indicated on the Contract <br />' Drawings, herein specified, or necessary to permit completion of the work under <br />this Contract. <br />' B. Blasting with explosives will not be permitted to complete any work under this <br />Contract. Care shall be taken not to damage any part of existing buildings, <br />foundations and exterior structures both below and above ground. <br />C. No existing structure, equipment, or appurtenance shall be shifted, cut, removed, <br />or otherwise altered except with the express approval of and to the extent <br />1 approved by the Engineer <br />D. Materials and equipment removed in the course of making alterations and <br />additions shall remain the property of the Owner, except that items not <br />salvageable, as determined by the Engineer and the Owner shall become the <br />property of the Contractor to be disposed of by him off the site of the work at his <br />' own place of disposal. <br />E. All work of altering existing structures shall be done at such time and in such <br />' manner as will comply with the approved time schedule. So far as possible <br />before any part of the work is started, all tools, equipment, and materials shall be <br />' 05/08 01046 -1 05 -4893 <br />