Laserfiche WebLink
D. If an equipment option is proposed, the option price must reflect any additional <br />installation and engineering costs required as a result of differences in equipment <br />installation requirements. No extra cost will be paid to the Contractor for <br />modification of concrete piping, electrical, etc., in the event the Owner elects to <br />accept an option. All revisions required shall be subject to the approval of the <br />Engineer. <br />PART 2 — PRODUCTS (Not Used) <br />PART 3 — EXECUTION (Not Used) <br />END OF SECTION <br />05/08 01100 -2 05 -4893 <br />