Laserfiche WebLink
EXHIBIT A <br />Atlantic Isles Roadway and Utility Improvements <br />Bid Estimated <br />Item Description Quantity Unit Unit Price Estimated Total <br />30 Furnish & Install 18" RCP drainage pipe complete <br />(including but not limited to excavation, bedding, <br />backfill, compaction & restoration as per plans <br />and specifications) <br />31 Furnish & Install 24" RCP drainage pipe complete <br />(including but not limited to excavation, bedding, <br />backfill, compaction & restoration as per plans <br />and specifications) <br />32 Furnish & Install 30" RCP drainage pipe complete <br />(including but not limited to excavation, bedding, <br />backfill, compaction & restoration as per plans <br />and specifications) <br />33 Ultralite Tideflex Check Valve <br />34 Vortech -Model 5000 <br />E Sanitary Sewer System and Force Main per <br />WASD Standards /Spec <br />35 F &I 8" PVC sanitary sewer complete (including <br />but not limited to excavation, bedding, backfill, <br />compaction & restoration as per plans and <br />specifications) <br />36 F &I 8" DIP sanitary sewer complete (including but <br />not limited to excavation, bedding, backfill, <br />compaction & restoration as per plans and <br />specifications) <br />37 F &I 10" PVC sanitary sewer complete (including <br />but not limited to excavation, bedding, backfill, <br />compaction & restoration as per plans and <br />specifications) <br />38 F &I 12" PVC sanitary sewer complete (including <br />but not limited to excavation, bedding, backfill, <br />compaction & restoration as per plans and <br />specifications) <br />39 Sanitary drop manholes 48" dia. <br />40 Core drill existing manhole #24 <br />41 Sanitary manholes 48" dia. <br />42 F &I 6" DIP force main complete (including but not <br />limited to excavation, bedding, backfill, <br />compaction & restoration as per plans and <br />specifications) <br />43 F &I 8" DIP force main complete (including but not <br />limited to excavation, bedding, backfill, <br />compaction & restoration as per plans and <br />specifications) <br />44 Miscellaneous sanitary PVC fittings <br />45 Miscellaneous DIP valves and fittings <br />46 F &I 6" sanitary services laterals complete <br />(including but not limited to excavation, bedding, <br />backfill, compaction & restoration as per plans <br />and specifications) <br />47 F &I 6" Force main bridge crossing as per detail on <br />addendum (Bridge No. A) <br />48 F &I 6" Force main bridge crossing as per detail on <br />addendum (Bridge No. B) <br />05/08 <br />Exhibit A -2 <br />325 <br />LF <br />50.00 <br />16,250.00 <br />1 <br />1,650 <br />LF <br />60.00 <br />99,000.00 <br />720 <br />LF <br />80.00 <br />57,600.00 <br />1 <br />EA <br />7,500.00 <br />7,500.00 <br />1 <br />LS <br />40,000.00 <br />40,000.00 <br />2,340 <br />LF <br />30.00 <br />70,200.00 <br />120 <br />LF <br />70.00 <br />8,400.00 <br />270 <br />LF <br />60.00 <br />16,200.00 <br />45 <br />LF <br />100.00 <br />4,500.00 <br />1 <br />EA <br />4,000.00 <br />4,000.00 <br />1 <br />EA <br />3,500.00 <br />3,500.00 <br />22 <br />EA <br />3,500.00 <br />77,000.00 <br />1,150 <br />LF <br />60.00 <br />69,000.00 <br />50 <br />LF <br />95.00 <br />4,750.00 <br />1 <br />LS <br />5,000.00 <br />5,000.00 <br />1 <br />LS <br />5,000.00 <br />5,000.00 <br />62 <br />EA <br />500.00 <br />31,000.00 <br />63 <br />LF <br />150.00 <br />9,450.00 <br />51 <br />LF <br />150.00 <br />7,650.00 <br />05 -4893 <br />