My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />Construction Performance Bond <br />4ond # 08 -6166 <br />Any singular reference to Contractor, Surety , Owner or other party shall be considered plural where applicable. <br />CONTRACTOR (Name and Address): <br />Tenex Enterprises, Inc. <br />850 Sw 14th Court <br />Pompano Beach. Fl. 33069 <br />OWNER (Name and Address): <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Avenue, Suite 250 <br />Sunny Isles Beach, Florida 33160 <br />SURETY (Name and Principal Place of Business): <br />First Sealord Surety, Inc. <br />789 E. Lancaster Ave <br />Villanova PA. 19085 <br />CONSTRUCTION CONTRACT <br />Date: <br />Amount: $ 2,885,048.00 <br />Description (Name and Location): <br />Atlantic Isles Roadway and Utility Improvements <br />construction of sanitary, sewer collection system with gravity sewer lines, manholes, WASD lift station and force <br />main paving grading and drainage improvements: under grounding of certain utilities such as FPL power, CATV and <br />telephone. The installation of a new water main with services is also proposed by the City of North Miami Beach to be <br />constructed contemporaneously, but not currently in this contract. <br />I <br />BOND <br />Date (Not earlier than Construction Contract Date): 8/6/08 <br />Amount: $ 2,885,048.00 <br />Modifications to this Bond Form: <br />NA <br />I <br />I <br />I <br />CONTRACTOR AS PRINCIPAL <br />Company (Corp. Seal) <br />Tenex Enterprises, Inc. <br />Signature.\, C_ <br />Name and Title: Hamid Fouladi President <br />CONTRACTOR AS PRINCIPAL <br />Company <br />Signature: <br />Name and Title: <br />SURETY <br />Company Vorp. Seal) ,f <br />First S*itle:... ret , c. /2/ <br />Signature: ZZ <br />Name and chele Council Attorney in Fact <br />SURETY <br />(Corp. Seal) Company <br />Signature: <br />Name and Title: <br />(Corp. Seal) <br />05/08 Final Version 00601 -1 05 -4893 <br />EJCDC No. 1910 -28A (1984 Edition) <br />Prepared through the joint efforts of the Surety Association of America, Engineers' Joint Contract Documents Committee, The Associated <br />General Contractors of America, American Institute of Architects, American Subcontractors Association, and the Associated Specialty <br />rnnt —t- <br />
The URL can be used to link to this page
Your browser does not support the video tag.