My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1273
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 1:43:11 PM
Creation date
10/7/2008 10:35:13 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1273
Date (mm/dd/yyyy)
06/19/2008
Description
Merkury Development City Hall Improv Agrmt 1st Amendment ($300,000)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />9.5.3. The CONTRACTOR agrees to maintain in force at all times during the life of the <br />construction, public liability insurance, by separate certificate, in an amount not less than $1,000,000 <br />for injuries, including willful death, to anyone person and subject to those same limits for each <br />person, in an amount not less that $1,000,000 for damages as a result of each occurrence and <br />property damage insurance and in an amount not less than $1,000,000 for damages on anyone <br />occurrence. Such policy shall specifically protect the CITY OF SUNNY ISLES BEACH, AND their <br />agents and employees, by making them an additional insured, and shall not be modified or <br />canceled without thirty (30) days written notice to the CITY OF SUNNY ISLES BEACH. <br /> <br />9.5.4 Should the final completion and acceptance of the work herein embraced together with <br />any modification or additions be delayed beyond the time herein set because of lace of performance <br />by the Contract, it is understood and agreed that aside from any other liquidated damage per day for <br />such delay from such time until the work is completed and accepted as herein provided, all costs of <br />engineering and inspection on behalf of the Owner will be charged to the contractor and deducted <br />from any estimate or payment otherwise due and payable to him from time to time. The costs of <br />engineering and inspection which may be charged to the Contractor by the Owner under this article <br />shall be equal to the Engineer's charges to the Owner. <br /> <br />IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in Five (5) parts. <br />One counterpart each has been delivered to OWNER, CONTRACTOR and ARCHITECT. All portions of <br />the Contract Documents have been signed, initialed or identified by OWNER and CONTRACTOR or <br />identified by ARCHITECT on their behalf. <br /> <br />This Agreement will be effective on <br />ATTEST:~./ ~ ---- <br /> <br />, 2008 (which is the Effective Date of the Agreement). <br /> <br />\(V'.h/\{,"'JA ~~\o~ t_ <br />\ G . <br /> <br />\ <br /> <br />By ~CA-\, ~. ~\\-eS <br /> <br />[CORPORATE SEAL] <br /> <br />[CORPORATE SEAL] <br /> <br />~~;~or:::~O:i~~~ \J ~ <br />~ Lo-\ <br />""^ '-.fA-I'\. ~ -c \ ~) ,3"D <br /> <br />, \ <br /> <br />"9r--e S,~-e ;( \ <br /> <br />\ <br /> <br />License No. C~ C. ~ b O~.<1.0 <br />Agent for service of process <br /> <br />(If CONTRACTOR is a corporation, attached <br />evidence of authority to sign). <br /> <br />Final Version <br /> <br />00500-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.