Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3. EXAMINATION OF DOCUMENTS AND SITE <br /> <br />3.1 Bidders shall visit the site of the proposed work and become familiar with <br />the nature and extent of work to be performed and local conditions that <br />may affect the work. <br /> <br />3.2 The Bidding Documents were prepared to present an essentially accurate <br />representation of existing conditions, interpreted from available <br />information on the site. The Bidder is not relieved, however, of the <br />responsibility of becoming fully informed as to existing conditions at the <br />site. <br /> <br />3.3 Bidders shall examine existing site improvements, and conditions, utilities, <br />and streets to determine all conditions, which will affect the Work. <br /> <br />4. INTERPRETATION OF BIDDING DOCUMENTS <br /> <br />4.1 All questions requiring clarification or interpretation of the Bidding <br />Documents shall be made in writing and shall reach the office of the <br />Owner at least 5 days prior to the date for receipt of bids. Direct all <br />requests to the attention of Bruce Wasersztein, Project Architect at <br />Cubellis, 1800 Eller Drive Suite 500, Fort Lauderdale, FL 33316; Fax: 954- <br />961-6807; Phone: 954-961-6806. <br /> <br />4.2 Any modification or interpretation of the Bidding Documents will be made <br />by Addendum to all who are recorded by the Architect as having received <br />a complete set of Bidding Documents. <br /> <br />4.3 Interpretations or modifications of Bidding Documents made in any <br />manner other than by Addendum will not be binding. <br /> <br />4.4 A Bidder, prior to submitting his Bid, shall ascertain that he has received <br />all Addenda issued, and shall acknowledge their receipt in the Bid Form. <br /> <br />5. SUBSTITUTIONS <br /> <br />5.1 Bidders represent that their Bid is based upon the materials and <br />equipment described in the Bidding Documents. <br /> <br />5.2 Requests for substitutions will be considered prior to receipt of bids if they <br />reach the Architect at least 5 days prior to the date for receipt of bids. <br /> <br />5.3 Acceptance by the Architect of a proposed substitution will be issued in <br />the form of an Addendum or Substitution Request Form. <br /> <br />04/08 Final Version <br /> <br />00100-2 <br />