My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1317
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 3:52:37 PM
Creation date
10/8/2008 9:49:29 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1317
Date (mm/dd/yyyy)
09/18/2008
Description
Trane Maintenance Agrmt for PCP Airconditioning ($10,930.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Air Handler Run Inspection (AHU-130) <br /> <br />Description <br />. Check the general condition of the fan, <br />. Verify smooth fan operation, <br />. Check and record supply and control air pressure, if applicable. <br />. Verify the operation of the control system, <br />. Log the operating conditions after the system has stabilized. <br />. Review operating procedures with operating personnel. <br />. Provide a written report of completed work, operating log, and indicate uncorrected deficiencies <br />detected. <br /> <br />Pump Annual Inspection (PMP-11 0) <br /> <br />. Record and report abnormal conditions, measurements taken, etc. <br />. Review customer logs with the customer for operational problems and trends. <br />. Check motor shaft and pump shaft for alignment, if applicable. <br />. Inspectthe coupling for wear. <br />. Verify that the shaft guard is in place and tight, if applicable. <br />. Verify water flow through the pump. <br />. Check for leaks on the mechanical pump seals, if applicable. <br />. Verify proper drip rate on the pump seal packing, if applicable. <br />. Verify smooth operation of the pump. <br />. Lubricate the motor bearings as necessary. <br />. Lubricate the pump bearings as necessary. <br />. Clean the starter and cabinet. <br />. Inspect wiring and connections for tightness and signs of overheating and discoloration, <br />. Meg the motor. <br />. Verify tight connections on the motor terminals. <br />. Check the condition of the contacts for wear and pitting, if applicable. <br />. Check the contactors for free and smooth operation. <br />. Verify proper volts and amps, <br /> <br />Pump Run Inspections (PMP-111) <br /> <br />. Verify smooth operation of the pump. <br />. Check for leaks on the mechanical pump seals, if applicable. <br />. Verify proper drip rate on the pump seal packing, if applicable. <br />· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies <br />detected. <br /> <br />$/8 <br /> <br />@2008 Trane All rights reserved <br /> <br />Page 8 of 11 <br /> <br />Service Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.