Laserfiche WebLink
<br />RESOLUTION NO. 2008- 132S <br /> <br />A RESOLUTION OF THE CITY COMMISSION OF THE CITY <br />OF SUNNY ISLES BEACH, FLORIDA, APPROVING THE THIRD <br />ADDENDUM TO THE AGREEMENT WITH MARLIN <br />ENGINEERING, INC. FOR THE SUNNY ISLES BOULEV ARD/ <br />SR826 PROJECT, IN AN AMOUNT NOT TO EXCEED TWENTY- <br />TWO THOUSAND SIX HUNDRED FIFTY DOLLARS ($22,650.00), <br />ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING THE <br />MAYOR TO EXECUTE THE THIRD ADDENDUM TO THE <br />AGREEMENT; AUTHORIZING THE CITY MANAGER TO DO <br />ALL THINGS NECESSARY TO EFFECTUATE THE TERMS OF <br />THE AGREEMENT; PROVIDING FOR AN EFFECTIVE DATE. <br /> <br />WHEREAS, on June 21, 2007, the City Commission adopted Resolution No. 2007-1110 <br />approving an agreement with Marlin Engineering, Inc., in an amount of Eighty-Four Thousand <br />Two Hundred Seventy-Two Dollars and Thirty-Nine Cents ($84,272.39), to provide Post Design <br />Services during the construction of the Sunny Isles BouIevard/SR 826 Project; and <br /> <br />WHEREAS, on November 15,2007, the City Commission adopted Resolution No. 2007- <br />1180 approving a First Addendum to the Agreement with Marlin Engineering, Inc., in an amount <br />not to exceed Forty-Six Thousand Nine Hundred Seventy-Three Dollars and Eighty-Five Cents <br />($46,973.85), to provide additional services by performing a Subsurface Utility Exploration <br />(SUE) so that FP&L can include the undergrounding of power lines, and to replace the existing <br />water main along the south side of Sunny Isles Boulevard; and <br /> <br />WHEREAS, on January 17, 2008, the City Commission adopted Resolution No. 2008- <br />1199 approving the Second Addendum to the Agreement with Marlin Engineering, Inc., in an <br />amount not to exceed Seventeen Thousand Four Hundred Fifty Dollars ($47,720.00), to provide <br />additional services by providing Post Design Services during construction to include: 1) <br />construction for the State Road 826 Sidewalk Enhancement Project, and 2) design of the <br />reconstruction sidewalk and the installation of supplemental drainage system in the form of <br />slotted drain at the northern right-of-way limit; and <br /> <br />WHEREAS, the City wishes for the Consultant to provide additional servIces by <br />providing Post Design Services during construction to provide consulting Civil Engineering <br />Services for the plans design of an existing I2-inch water main extension relocation along Sunny <br />Isles Boulevard from approximately Sta. 134+51 to Sta. 136+45 connecting to the newly <br />constructed water main completed by St. Tropez on the Bay Project; and <br /> <br />WHEREAS, Marlin Engineering, Inc. has submitted a proposal, and the City wishes to <br />accept the proposal modifying the agreement to include this work, in an amount not to exceed <br />Twenty- Two Thousand Six Hundred Fifty Dollars ($22,650.00), for a total contract amount of <br />$201,616.24, attached hereto as Exhibit "A". <br /> <br />) <br /> <br />R2008- Marlin Engineering 3rd Amend SlBlvd Project <br /> <br />Page I 01'2 <br />