Laserfiche WebLink
<br />Executive Summary <br /> <br />Our analyses and recommendations based on measurements taken and data <br />received, are submitted for your review and evaluation. Our analysis of the <br />profile is tentative on this data; however, it should convey the approximate <br />general condition of the facility. Following are among the highest priority <br />items to be considered towards electric bill reduction, power quality <br />enhancement, and optimum operation of the facility: <br /> <br />1. KW-Demand, and KWH-consumption reduction. <br />2. Voltage Stability and Phase Balancing. <br />3. Mitigation of Harmonicsr Surges, and Transients. <br />4. Power Factor improvement. <br />S. Protection and increased Longevity of Equipment and Machinery. <br /> <br />Following review of the proposal, we feel that improvements can readily be <br />seen through the special introduction of our proven field-tested, and <br />internationally renowned ElectroFlow™ system with national and <br />international recognition. Such a system will reduce KW Demand and KWH <br />consumption, mitigate harmonics, stabilize voltage, balance the three phase <br />system, increase longevity of machinery and equipment, reduce losses, <br />which result in a more efficient use of your power as well as operating cost <br />reductions. <br /> <br />Reca pitu lation <br /> <br />Recapitulation of ElectroFlow™ cost and associated payback period(s) is <br />tabulated herein. The prices quoted remain firm for a period of 30 days from <br />the proposal's date, after which they may be subject to change. <br /> <br />Load Center <br />MSB <br /> <br />System Cost (USD) <br />$36,697 <br /> <br />Savings (USD) Payback (Yr.) <br />$9,678 3.8 <br /> <br />1 <br />