Laserfiche WebLink
<br />ATTACHMENT A <br />GRANT WORK PLAN <br />City of Sunny Isles Beach <br />LP8978 <br /> <br />Project Title: Provide a brief title for the project proposed. Central Island Drainage Project <br />Project Location: Identify the location of the project and include the county/counties involved in the project area, <br />If this project affects water, include the watershed and hydrologic unit code. The Central Island Drainage <br />Project is the area bounded on the north by 183rd Street, on the south by 178th Street, on the east by <br />Collins Avenue (A-I-A), and on the east by the intercoastal waterway. This is all within the city limits of <br />the City of Sunny Isles Beach Florida. <br />Project Background: Provide a summary of the site/project area and the justification supporting the need for the <br />Florida Department of Environmental Protection to fund the proposed project. <br />This project contemplates the construction of approximately twenty wells and several thousand feet of <br />large diameter underground drain lines to eliminate surface flooding in the project area. Currently, <br />there are times that large areas of residential complexes are inaccessible because of flooding. The City <br />has recently constructed a new community center in the project area and Miami-Dade Schools is <br />completing construction on BB-l, a kindergarten through eighth grade school, also in the project area. <br />To insure the health and safety of the residents, and the visitors to the area, this project is-essential. <br />Project Objectives: Provide a list of objectives, In bullet format, expected to be achieved as a result of <br />fundinglcompleting this proposed project, <br />. Objective 1: To stop flooding. <br />. Objective 2: Improve Health and Safety <br />. Objective 3: To improve mobility and accessibility in extreme weather conditions. <br />Project Description: Provide a detailed description of the work to be performed for the project. Include maps, <br />drawings etc. to support project activities, Project descriptions should include a specific list of tasks/activities for <br />accomplishing the project. <br /> . <br />Please see set of construction drawings. <br />Project Milestones/Deliverables/Outputs: Identify by task/activity (as listed under Project Description), start <br />date, and completion date. Clear cells in table below header row before beginning to add data. Identify <br />outputs/deliverables to result from this project. (Examples include: reports (progress, draft project report, final <br />project report), manuals, videos, maps, BMPs installed. meetings, field days, issued permits, progress reports, <br />quality assurance plans, etc.) Identify dates for providinglcompleting the outputs/deliverables on a schedule based <br />on the date of agreement execution. Format should appear as follows: <br /> <br />DEP Agreement #####, Attachment A, Page 1 of ~ <br />