Laserfiche WebLink
1 <br /> .,..., <br /> �� - &ifewiire <br /> SAFETY•SERVICE•RESPONSE <br /> Cabling Infrastructure: <br /> r -21 i <br /> • <br /> Air <br /> The Safeware Team will run multiple copper conductors to address all door device <br /> requirements for each device located at the door. All cabling will be run inside the electrical <br /> contractor provided conduit (not in this proposal) and terminated in the IDF Closet located in <br /> the first floor of Gateway Park. Connection to City Network will take place through the KT400 IP <br /> connection and interconnect to others will be through RS485 connection. <br /> Electronic Locking Mechanism (25): <br /> \_ dCE. <br /> r- <br /> All Double Door and Single Doors will be armed through a magnetic Locking mechanism that <br /> will be surface mounted at the corner of a single door and on the center for double doors. All <br /> ,(15) at Gateway Park will be equipped with this type of locking mechanism. Access control will <br /> be tied into the fire alarm system for lock release in case of fire emergency. <br /> j <br />