Laserfiche WebLink
_'� Safeware <br /> SAFETY•SERVICE•RESPONSE <br /> The Safeware Team- GATEWAY Revis 5/6/2015 <br /> PARK ed. <br /> Access Control <br /> N <br /> o Description CI <br /> ANUFA <br /> UM MODEL QT TOTAL <br /> TURER <br /> R P K-40 <br /> MULTI CLASS PROXIMITY READER EA HID MCLASS 15 15 <br /> PASSIVE IR FOR ALARM SHUNT AND DOOR EA BOSCH DS 1501 15 15 <br /> RELEASE <br /> DOORS <br /> LOCKING MECHANISM FOR ENFORCE <br /> EA 600LB 25 25 <br /> ENFORCE <br /> PLATE FOR MAGNETIC LOCK EA R 600LB 25 25 <br /> ALTRONI ALTV <br /> EA ULI-4 7 <br /> POWER SUPPLY FOR LOCKS X LOCKS 7 <br /> MONAC PNEUM <br /> PNEUMATIC PUSH BUTTON FOR RELEASE EA 0 ATIC 15 15 <br /> DOOR STATUS SENSORS EA GE 1078 27 27 <br /> E NT- <br /> EA KANTECH CORPO 1 <br /> KANTECH CORPORATE-ENTRAPASS RATE 1 <br /> MIDDLE ENCL. <br /> RACK ENCLOSURE FOR DEVICES EA ATL FULL 1 1 <br /> 17" <br /> EA Tripplitte slide 1 <br /> KVM SLIDE TRAY FOR SYSTEM tray 1 <br /> THE <br /> WORKSTATION FOR ALARM MONITORING EA SAFEWA ACCESS 1 <br /> AND DATA ENTRY RE TEAM 1 <br /> KANTECH KT-300 DOOR PANELS EA KANTECH I KT-300 6 6 <br /> KANTECH KT-400 DOOR PANEL W TCP/IP EA KANTECH I KT-400 1 1 <br /> ALTRONI <br /> I/O BOARD FOR ADDITONAL INPUTS EA X I/O 1 1 <br /> Rugged Switches, Radios, Backhaul Antennas, THE THE <br /> Surge Supresion,Surge Arrestors- Bridge for SAFEW <br /> EA SAFEWA 4 4 <br /> Gateway, Pier, and City Hall Communication ARE <br /> link RE TEAM TEAM <br /> THE <br /> THE <br /> Labor Installation for standard poles, roof and SAFEW <br /> EA SAFEWA 4 4 <br /> towers. Includes brackets,straps, engineering, ARE <br /> RE TEAM <br /> and windload analysis TEAM <br /> WS- <br /> CISCO SWITCH EA CISCO 92 1 1 <br /> J 1 L' <br />