My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2583
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2583
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2016 11:54:28 AM
Creation date
10/18/2016 11:54:20 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2583
Date (mm/dd/yyyy)
09/15/2016
Description
2nd Amd to Agmt w/Safeware to Extend Agmt to 01/14/17 (for Gateway Park)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> • <br /> Sfeware� <br /> SAFETY•SERVICE•RESPONSE <br /> Proposed Methodology. <br /> The Safeware Team organizes its projects much like a General Contractor assigning a Project <br /> Manager and a team of qualified individuals to streamline the process for meeting milestones <br /> and completing the tasks within a scheduled timeframe. The work required is integrated into a <br /> logical process as demonstrated in the following task oriented illustrations. All of the program <br /> steps are not required for a project but are included to assure completion of all necessary <br /> details. <br /> INTEGRATED SECURITY PROGRAM <br /> Phase 1 - Conceptual Analys s= <br /> l <br /> CONDUCT SITE SURVEY-.THREAT ANALYSIS PREPARE ANALYSES _= <br /> Al 1 <br /> IDENTIFY-ASSETS DEVELOP SCENARIOS <br /> • <br /> The pages shown, under each general heading, illustrate an item to be evaluated or performed under <br /> the main task heading. <br /> r1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.