My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2598
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2598
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2016 12:09:01 PM
Creation date
10/18/2016 12:08:46 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2598
Date (mm/dd/yyyy)
09/15/2016
Description
3rd Amd to Agmt w/Enviro Waste Srvs for StormWater Mgmt System Prev. Main. Srvs
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nviroTs <br /> • <br /> • tom. 1 <br /> Services . Group , Inc . <br /> March 26, 2014 <br /> ITB 14-02-01 <br /> Stormwater Management System Preventative Maintenance <br /> City of Sunny Isles Beach <br /> 18070 Collins Ave, <br /> Sunny Isles Beach, Fl. 33160 <br /> Staffing <br /> EnviroWaste Services Group, Inc has had its core group of managers since 2001 and <br /> has remained unchanged. This is due to them all being owners within the company. <br /> While EnviroWaste Services Group, Inc has over 100 employees, the City will deal only <br /> with a few directly. Our personnel are well qualified and experienced to gather and <br /> provide the correct information to maintain your roadways safe for the motoring public. <br /> After the notice to proceed is issued, EnviroWaste Services Group will issue their own <br /> internal project number. This is done by the accounting department, so that when the <br /> job is finished, accounting knows what needs to be billed for a timely closeout. <br /> The job is then scoped out by the project manager, in this case Eddy Barba. During the <br /> field survey, the drains are inspected to verify sediment levels and conditions. Also at <br /> this same time we identify which areas will need dewatering and where plugs and <br /> pumps will be placed. Once it is known what needs to be done, the work is scheduled, <br /> typically within two to three days, although many emergencies are started the same <br /> day. <br /> The work is typically assigned to the same crews so as to build a relationship between <br /> the field personnel and the city. This avoids the city getting a new person every day, <br /> and it helps in continuity and quickens the work. EnviroWaste Services Group has many <br /> trained Vactor operators and CCTV operators. All of them have direct experience <br /> working for municipalities. All of our CCTV operators are trained in NASSCO PACP. <br /> During the cleaning and inspection operations, Eddy Barba is in contact with city <br /> personnel informing them of the status of the progress. <br /> After the work has been completed the videos are processed and quality assured and <br /> quality controlled at the corporate office in Miami. The videos are reviewed and <br /> recommendations are then made. The quality control is done by our own in house <br /> PACP trainer, Leyma Cuesta. <br /> Final submittal to the city will be made by Eddy Barba, at which point he will review the <br /> findings with the city staff. <br /> Headquarters: 4 SE 1st Street, 2"d Floor, Miami, FL 33131 * (877) 637-9665 * F (305)637-9659 <br /> Offices: Miami, FL * Orlando, FL * Dallas, TX * Houston, TX <br /> www.envirowastesd.com * email: info@envirowastesg.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.