My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2621
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 12:05:21 PM
Creation date
10/24/2016 12:04:01 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2621
Date (mm/dd/yyyy)
10/20/2016
Description
CO #12, Florida Engineering Dev. Corp, 174 St. Roadway Impr. Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Engineering 8 Development Corp <br /> 12076 NW 98th Ave. FLORIDA ENGINEERING <br /> Hialeah Gardens Fl.33018 d DEVELOPLtdXENT CORP. <br /> E"li!!t!t�YpM <br /> l,Y.l.rlr Cl.,wnr <br /> Project:NE 174th Street Roadway Improvements <br /> Scope of work:Island located front of Wiston Towers 200 STA 15+00 will be split to create a turn area for the vehicles <br /> Tum area will be approximately 35'x 20' <br /> Contract time add:10 days.came <br /> Location: NE 174th Street <br /> Date: 10/14/16 <br /> . . - • . . • - . PROPOSED AMD No. 13 Split up ISLAND AT STA 15+00 <br /> I. Split up Island located front of Wiston Towers 200 <br /> No. Item Qty Unit Unit Price Total <br /> A) MOT and Police <br /> 1 Police Officer 80 Hrs $ 60.00 $ 4,800.00 <br /> 2 Barricades/Signs 10 Day $ 355.00 $ 3,550.00 <br /> Sub-Total MOT and Police $ 8,350.00 <br /> B) Island Clearing and Grubbing <br /> Items to be demolish: <br /> Top Soil 89 sy <br /> Type 0 curb 70 If <br /> Dispose Irrigation Pipe 4-2"to 3/4"PVC pipe 50 If <br /> Dispose Electrical Pipe 4-2"PVC pipe 50 If <br /> Labor <br /> 3 Foreman . 16 Hrs $ 54.34 $ 869.44 <br /> 4 Operator(1). 24 Hrs $ 42.26 $ 1,014.24 <br /> 5 Laborer(2) 48 Hrs $ 28.98 $ 1,391.04 <br /> Equipment <br /> 6 Backhoe 24 Hrs $ 105.00 $ 2,520.00 <br /> 7 Loader 16 Hrs $ 86.25 $ 1,380.00 <br /> 8 Saw cut machine 4 Hrs $ 35.00 $ 140.00 <br /> 9 Truck(hauling)Top Soil 7 Load $ 137.50 $ 962.50 <br /> 10 Truck(hauling)concrete 2 Load $ 200.00 $ 400.00 <br /> 11 Truck(hauling)pipes 1 Load $_ 200.00 $ 200.00 <br /> Sub-Total Clearing and Grubbing $ 8,877.22 <br /> C) Restoration of Turn Island . <br /> 12 Electrical sleeve 1 Is $ 1,650.00 $ 1,650.00 <br /> 13 Irrigation sleeve 1 Is $ 2,250.00 $ 2,250.00 <br /> 14 Tree relocation 2 ea $ 750.00 $ 1,500.00 <br /> 15 12"Limerock Base for Road Reconstruction 90 SY $ 15.60 $ 1,404.00 , <br /> 16 12"Sub base Course for Road Reconstruction . 90 SY $ 3.20 $ 288.00 <br /> 17 Tencate Mirafi 180 SY $ 5.00 $ 900.00 <br /> 18 3"Type SP-9.5 Asphalt(2 Lifts)for Reconstruction Road 90 sy $ 21.50 $ 1,935.00 , <br /> 19 Asphalt min Mobilization 1 ea $ 3,500.00 $ 3,500.00 <br /> 20 Type D curb 110 Lf $ 15.00 $ 1,650.00 <br /> Sub-Total Restoration $ 15,077.00 , <br /> TOTAL PROPOSED AMD 13 $ 32,304.22 <br /> Omar Medina <br /> Florida Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.