Laserfiche WebLink
<br />OCEAN BAY CONSTRUCTION, INC. <br />COMPLETED PROJECTS <br /> <br />REMOV AL OF EXISTING LEAD SERVICES <br /> <br />City of Miami Beach <br />1700 Convention Center Drive <br />Miami Beach FL 33139 <br />Contact: David Cates (305)673-7080 <br /> <br />Removal of Existing Lead Services Replacing With Driscoll Pipe. <br /> <br />240 Calendar Days <br />Final Contract Amount - $499,000.00 <br />Final Contract Completion Date - May 2, 1996 <br /> <br />COMMUNITY DEVELOPMENT BLOCK GRANT SUAREA <br /> <br />City of Boynton Beach <br />100 E Boynton Beach Blvd. <br />Boynton Beach FL 33435 <br />Contact: Michael Kazunas (561 )734-8111 <br /> <br />Redevelopment of Neighborhood Installing Storm Drainage. CAP Pipe (24" 3,000 L.F.), Catch Basins, <br />Manholes, Fire Hydrants, Water & Sewer House Connections, C-900 PVC Pipe (12" 1,000 L.F.), Site <br />Clearing, Excavation, Limerock Base, Paving, Irrigation & Landscaping. <br /> <br />210 Calendar Days <br />Original Contract Amount - $512.881.66 <br />Final Contract Amount - $512,881.60 <br />Commencement Date - April 14, 1992 <br />Original Contract Completion Date - November 30, 1992 <br />Actual Contract Completion Date - November 30, 1992 <br /> <br />10 <br />