My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ocean Bay Construction, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Responses
>
Ocean Bay Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:44 PM
Creation date
8/7/2008 2:19:47 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />OCEAN BAY CONSTRUCTION, INC. <br />COMPLETED PROJECTS <br /> <br />TRADE~NDSESTATES <br /> <br />Palm Beach County <br />PO Box 21229 <br />West Palm Beach FL 33416-1229 <br />Contact: Carl Miller (561)684-4000 <br /> <br />C-900 PVC (8" 0 - 14' 3,000 L.F.), Manholes, Catch Basins (0 - 16' 50 Ea.), RCP Pipe (15" - 30" <br />3,000 L.F.), DIP (6" - 8" 8,000 L.F.), Fire Hydrants, Water & Sewer House Connections, Installation of <br />Pump Station at 24' Depth, Limerock Base, Concrete, Paving, Irrigation & Landscaping. <br /> <br />240 Calendar Days <br />Original Contract Amount - $913,864.96 <br />Final Contract Amount - $914,740.17 <br />Commencement Date - January 4, 1993 <br />Original Contract Completion Date - October 1, 1993 <br />Final Contract Completion Date - November 14, 1994 <br /> <br />TURN LANE AT SE 5 STREET & SE 3 AVENUE <br /> <br />Broward County Board of County Commissioners <br />115 S Andrews Avenue <br />Ft Lauderdale FL 33301 <br />Contact: George EdwardsIDarwin Townsend <br />(954)357-6280 <br /> <br />Realignment and Reconstruction Project consisting of Excavation, Sub grade, Limerock Base, PCP <br />Drainage, Curb & Gutter, Paving, Concrete Sidewalks, Landscaping & Demolition of2-Story Building. <br /> <br />180 Calendar Days <br />Final Contract Amount $333,445.00 <br />Commencement Date - January 26, 1991 <br />Final Contract Completion Date - August 16, 1991 <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.