My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ocean Bay Construction, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Responses
>
Ocean Bay Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:44 PM
Creation date
8/7/2008 2:19:47 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />! <br /> <br />.1 <br /> <br />35. The quantities represent the trench itself, not the tracks for restorations? <br />Please refer to Sheet # 5, Note 17: "For construction of the sewer system contractor <br />shall saw cut pavement along the proposed utility trench. Cost for backfill with suitable <br />selected material and reposition of pavement, driveways or landscaped areas to its <br />original conditions and elevations shall be included in the unit price for sewer <br />construction. " <br /> <br />36. What about Royal Palm trees? <br />Please refer to answer to question # 34 <br /> <br />37. The expanding road coming along the side is a concern as it is very expensive to remove <br />trees. <br />In some cases it may be better to move the pipe rather than the tree. As directed by the <br />Engineer. <br /> <br />38. Is there going to be variance on this project? You have an item 500 linear feet stakes/fence <br />buried in that item. <br />Staked silt fence will be used around well and trench construction areas as needed. <br />Floating silt barriers will be used during construction at existing outfalls to the bay. <br /> <br />39. Do you have an area set aside for a staging area? <br />Contractor must provide its own staging area. <br /> <br />40. Do you have an area set aside for a field office? 1 ( <br />The City does not have an area set aside for field office. <br /> <br />41. What about clearing and grubbing, is it by the acre, 14 acres? <br />Clearing and Grubbing was deleted. However, pay items were added. <br /> <br />42. Will it be better to pay as a lump sum for the clearing and grubbing, it is going to be a <br />breaker item. What is the government standard for that? <br />Clearing and Grubbing was deleted. However, pay items were added. <br /> <br />43. If school is not done by January, will there be a conflict for closing road? <br />Use alternate access to the site. Contractor will address this issue on its work schedule. <br /> <br />44. Crossings, does the contractor get paid for limerock used? <br />Limerock will be paid when used as base material. Also, use lime rock for Item 102.3 <br />Commercial Material for Driveway Repair. <br /> <br />45. Will the City be looking for trench backfill? <br />Trench backfill is indicated as a part of unit price for sewers. <br /> <br />46. On the backfill will the contractor be able to utilize material for trench backfill? <br />Trenches shall be backfilled with suitable material. Sheet # 39, indicate the type of <br /> <br />Bid07 -1 0-02Prc-BidCon fcrenecQ A(2),doe <br /> <br />Page 5 of 7 <br /> <br />~-4~ j <br />~ jPvv <br />
The URL can be used to link to this page
Your browser does not support the video tag.