My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Solo Construction Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Responses
>
Solo Construction Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:44 PM
Creation date
8/7/2008 2:35:42 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Contractor must use Sunny Isles Police ofncers, unless otherwise approved by the <br />City ofSunuy Isles Police Department (Sandra Block is the contact person and may be <br />reached at 305.792.1839). <br /> <br />If no City Officers are available, others may be approved by the City. Fees are $40.00 <br />per Officer/Hour for regular days and $60.00 per Officer/Hour during holidays. <br /> <br />6, Are there any requirements for notification to homeowners? <br />Yes. Contractor must notice homeowners and must hold public awareness meetings. <br /> <br />7. Will the City pay for testing of density and concrete? <br />Refer to DIVISION I, GENERAL SPECIFICATIONS. Section 7, Payment of Test by <br />City. <br /> <br />8. Will the City pay for stored materials? <br />NO. <br /> <br />9. What is the current condition of the existing drainage pipes to be desilted? What percentage <br />of the pipe is filled with dirt? <br />Pipes to be desilted have been identified on plans attached to this Addendum. <br /> <br />10. Should structures be included too (in case they need to be cleaned) or will there be a new bid <br />for that? <br />The cost of drainage structure desilting should be included in the pipe desilting unit <br />price. <br /> <br />11. Is there any exfiltration of the pipe or is it all solid for drainage? <br />No exfiltration pipes are used in this project. The pro.iect requires all solid pipes for <br />drainage. <br /> <br />12. There are existing drainage pipes shQwn on the plans that are not labeled to be removed. Is <br />there any intent for these lines, perhaps abandonment? <br />Existing drainage pipes not labeled to be removed are to remain. See Sheet # 5 Note #5 <br />of the construction plans. <br /> <br />13. Would you consider muck removal as part of that? <br />No excavation is considered for remaining pipes. For new sewer construction: use <br />special type of pipe bedding as indicated on sheet #37. <br /> <br />14. Paving: there are two types of road, curb and gutter, and you have a specific type of <br />material, you ask for 1" milling, 2" resurfacing, and remove the existing pavement to <br />approximately 1 ", use type S-1 asphalt concrete.? <br />Use Type S-l Mix, as per Miami-Dade County standards. <br /> <br />15, You also say you want a 2% slope. Sometimes you can't follow that. <br />Refer to Sheet # 5. <br /> <br />16. It has a lot of curb and gutter but type S-1 asphalt concrete is not recommended to be used to <br />mix for this final course any more. <br /> <br />Bid 07-10-02 Pre-Bid Conference QA (2) <br /> <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.